Design and execution services, supply and installation of products for the investment objective "ARRANGEMENT OF ELECTRIC VEHICLE CHARGING STATIONS CHISCANI COMMUNE, BRĂILA COUNTY"
Servicii proiectare si execuţie de lucrari, furnizare si instalare produse în cadrul obiectivului de investiţii “AMENAJARE STAȚII DE REÎNCĂRCARE VEHICULE ELECTRICE COMUNA CHISCANI, JUDEȚUL BRĂILA”
Romania · Chiscani · how to bid here →
Your path to submission
- Deadline: 16 October at 15:00 — 13 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: RON.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 41% of this buyer's awards went to companies that had already won here before (83 awards since 2024, spread over 49 companies). That is well below the sector norm (78%) — this buyer switches suppliers more often than others.n = 83 awards since 2024
- Not one of the 83 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 83
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/09/2026.
Foreign bidders
In Romania · Electrical machinery, 36 contracts went to foreign companies over the last 3 years (of 75,301 recorded awards) — mostly from France, Italy, Germany.
Submission language: RON.
Typical field: median 4 (from 1,649 awards).
What the buyer is looking for
This Tender Specifications form an integral part of the Tender Documentation for the procurement of Services for the design and execution of works, supply and installation produced under the investment objective ‘MENDATION OF COMMON ELECTRIC VEHICLES RELOADING STATES CHIȘCANI, JUDEȚUL BRĂILA’ ” under this procedure, the Municipality of Chișcani fulfils the role of Contracting Authority or Purchaser under the Contract. Area and location − Objective 1 – Recharging station no. 1 (City Hall Area): The total land area for the station site is 1,103.00 m2, but the individualized land area for investment is 25.00 m2. − Objective 2 – Recharging station No 2 (Dispensary area): The total land area for the station site is 2,517.00 m2, but the individualized land area for investment is 77.00 m2. − Objective 3 – Recharging station No 3 (Salt Lake): The total area of the land intended for the site is…
Show full description
… represented by the area of the entire parking lot, but the individualized area of land intended for investment is 77.00 m2. The main investment is the installation of 3 (three) electric vehicle charging stations consisting of 2 (two) charging points. Each station will be composed of a recharging point that will allow multi-standard charging in direct current at a power of 75 kW and a recharging point that will allow charging in alternating current at a power of 22 kW. The stations will be placed next to the proposed parking lot, the parking spaces next to the station (2 pcs.) will be marked and highlighted accordingly. The parking space intended exclusively for charging electric vehicles will be marked, according to the Financing Guide, with green color with image and information panel Characteristics of the road surface: In order to modernise the road structure, the following stratification will be adopted: wear layer of asphalt mixture BA 16 6 cm thick; − BADPC 22,40 type asphalt mixture bonding layer, 4 cm thick; − layer of broken stone 15 cm thick; 20 cm thick ballast foundation layer; − a layer of ballast shape with a thickness of at least 10 cm. The collection and evacuation of water from precipitation will be carried out in roadways, berths. The connection of the car parks will be provided in a circular plan. The geometrical elements in the plan, including the spatial arrangement, will be established in accordance with the provisions of STAS 863/85 and STAS 10144-3/91 – ‘Streets. Geometric elements. Design requirements’ and O.M.T 50/1998. For traffic safety, road signs and markings applied to the layers of asphalt clothing will be provided according to the norms in force Pedestrian surface characteristics: The pedestrian arrangement solution consists in the arrangement of pedestrian pavements (objective 2 / objective 3) and the elements around them Number of days until which clarifications can be requested before the deadline for submission of tenders / candidates: 20. The contracting authority will respond clearly and completely to all requests for clarifications 12 days before the deadline for submission of tenders.
What you must prove — eligibility criteria
Experienta similara – furnizare produse si montaj Ofertanții vor face dovada furnizării de produse similare în valoare cumulată de cel putin 1.112.17547 lei fara TVA, la nivelul amaximum 3 contracte, derulate în ultimii 3 ani, calculați retroactiv de la data l… ▸▾
Experienta similara – servicii de proiectare Ofertantul trebuie să fi prestat servicii în ultimii 3 ani, în cadrul a maxim 2 contracte, a căror valoare cumulată să fie cel puțin egală cu 42.500,00 lei, exclusiv TVA. Prin servicii similare cu cele care fac obie… ▸▾
Ofertantul are obligația de a preciza partea/părțile din contract pe care urmează să le subcontracteze și datele de recunoaștere ale subcontractanților propuși, dacă aceștia sunt cunoscuți la momentul depunerii ofertei. DUAE completat de ofertant va include și… ▸▾
Ofertantul trebuie sa faca dovada implementării sistemului de management al calitatii conform SR EN ISO 9001 sau echivalent in domeniul in care se incadreaza activitatea principala ce face obiectul contractului Operatorul economic (lider, asociat, tert sustina… ▸▾
Ofertantul trebuie sa faca dovada implementării sistemului de management al mediului conform SR EN ISO 14001 sau echivalent in domeniul in care se incadreaza activitatea principala ce face obiectul contractului Operatorul economic (lider, asociat, tert sustina… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| B.G.D. IMPEX S.R.L. | 14 | 2024–2026 |
| ANVISOR TRANS | 3 | 2024–2026 |
| BICANIN SERV | 3 | 2024 |
| APAN | 3 | 2024 |
| TUDORACHE CONSTANTIN VALENTIN | 2 | 2024 |
How often this buyer tenders this