New production of office and parking building
Renen nyproduktion av kontor och parkeringshus
Sweden · Umeå · how to bid here →
Your path to submission
- Deadline: 10 November at 00:00 — 37 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SWE, SWE.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew 3 bids (48 procedures with a bid count); 15% ended with a single bidder. Sector: median 7 bids.n = 48
- 0% of this buyer's awards went to companies that had already won here before (51 awards since 2016, spread over 0 companies). 100% went to new names.n = 51 awards since 2016
- 6% of awards went to companies from abroad (51 awards with a known winner country). Sector average: 4%.n = 51
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Sweden · Construction work, 4 contracts went to foreign companies over the last 3 years (of 637 recorded awards).
Submission language: SWE.
Typical field: median 8 (from 711 awards).
What the buyer is looking for
AB Bostaden carries out the procurement on behalf of the developers in accordance with AFA.11 in Annex 6.1 Administrative regulations The project includes new construction of office buildings and car parks on Kv. Renen in Umeå municipality. The office building includes new construction of office buildings and associated earthworks. The BTA is about 11,800 sqm. The new construction of the office consists of two interlocking, staggered building volumes that include a basement floor, six office floors and one attic floor. The project also includes new construction of parking garages with 312 places, incl. RHP sites and associated earthworks. BTA is about 10,300 sqm
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Swedish.