Framework Agreement Sustainability and EML Measures
Raamovereenkomst Duurzaamheid en EML-maatregelen
Netherlands · Den Haag · how to bid here →
Your path to submission
- Deadline: 2 November at 09:00 — 29 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD, NLD, NLD, NLD, NLD, NLD, NLD, NLD, NLD, NLD, NLD, NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (97 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to Avitec Infra & Milieu.n = 97
- 13% of this buyer's awards went to companies that had already won here before (530 awards since 2015, spread over 171 companies). 87% went to new names.n = 530 awards since 2015
- The median procedure drew 3 bids (482 procedures with a bid count); 18% ended with a single bidder. Sector: median 4 bids.n = 482
- 7% of awards went to companies from abroad (530 awards with a known winner country). Sector average: 2%.n = 530
- 27% of the bids received came from small and medium-sized enterprises (221 procedures with a bid mix). Sector: 29%.n = 221
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands · Construction work, 31 contracts went to foreign companies over the last 3 years (of 2,392 recorded awards) — mostly from Belgium, Germany, Italy.
Submission language: NLD.
Typical field: median 3 (from 92 awards).
What the buyer is looking for
The assignment concerns the integral preparation and realization of energy-saving measures (EML) within the real estate portfolio of the Ministry of Defence, with the aim of ensuring that the buildings comply with the statutory energy-saving obligation in a timely manner and to contribute to the sustainability of the national real estate. The task is characterised by a large size, high time pressure and the need to scale up, whereby the EML measures must be achieved by the end of 2029. See Section 2.4.1 of the Procurement Guidance.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Heijmans Utiliteit B.V. | 6 | 2024–2026 |
| Hegeman Bouw & Infra B.V. | 5 | 2024–2025 |
| Smits Van Burgst Beveiliging B.V. | 5 | 2024–2026 |
| Unica Installatietechniek B.V. | 5 | 2023–2025 |
| Sweco Nederland B.V. | 4 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.