Friedrich & ClementBETA

ROV 31 2027-2030 Framework Agreement Supply Push Pits and Additional Components

ROV 31 2027-2030 Raamovereenkomst Leverantie stuwputten en bijkomende onderdelen

Netherlands · Lelystad · how to bid here →

Your path to submission

  1. Deadline: 10 November at 09:00 — 37 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: NLD.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 6% of this buyer's awards went to companies that had already won here before (69 awards since 2015, spread over 23 companies). 94% went to new names.n = 69 awards since 2015
  • The median procedure drew 3 bids (65 procedures with a bid count); 29% ended with a single bidder. Sector: median 3 bids.n = 65
  • The award came in at a median 86% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too high here.n = 6
  • 4% of awards went to companies from abroad (69 awards with a known winner country). Sector average: 8%.n = 69

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Netherlands · Construction materials, 31 contracts went to foreign companies over the last 3 years (of 405 recorded awards) — mostly from Germany, Belgium, France.

Submission language: NLD.

Typical field: median 3 (from 339 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Description With this European open call for tenders, the Contracting Authority aims to award contracts for the supply of thrust wells and additional components. The detailed description of the supply and the associated performance conditions are set out in the framework agreement with reference ROV 31 Implementation years 2027-2030. The supply consists mainly of the supply of: - Thrust wells; - Attachment (bucket); - Cuffs; - Rear sliders. Duration The agreement is concluded for a period of 4 years until 31 December 2030. The partial contracts shall be awarded during the period from the award of the contract until 31 December 2030. Scope of the Framework Agreement The expected financial volume over the total duration of 4 years is a maximum of 362.000,00 euro (excluding VAT). Size indication per execution year is 90.500,00 euro excluding VAT. These figures are an estimate of financial size and no rights can be derived from them.

Machine translation (EU eTranslation) — official wording via the PDF link.

Selection criteria — via the ESPD

The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.

Contract

BuyerWaterschap Zuiderzeeland
TypeSupplies
Estimated value362.500 €
Published30 September 2026
CategoryConstruction materials · CPV 44115100

Who has won here before

CompanyAwardsPeriod
Aannemingsbedrijf Netjes B.V.32024–2025
Berkhof BV32025
Kwint BV12025
Aannemingsmaatschappij van Gelder B.V.12025
Cimpro B.V.12024
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.
·
days until the deadline — Tuesday 10 November at 09:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →