31215858: Security Culture Impulse PPO/GPO
31215858: Veiligheidscultuurimpuls PPO/GPO
Netherlands · Utrecht · how to bid here →
Your path to submission
- Deadline: 6 November at 15:00 — 34 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (19 awards, most recently February 2026) — by that rhythm the next award was due around April 2026. The last award went to IGG Bouweconomie B.V..n = 19
- The award came in at a median 30% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 5
- The median procedure drew just one bid (703 procedures with a bid count); 50% ended with a single bidder. Sector: median 5 bids.n = 703
- 15% of this buyer's awards went to companies that had already won here before (765 awards since 2014, spread over 135 companies). 85% went to new names.n = 765 awards since 2014
- 20% of the bids received came from small and medium-sized enterprises (219 procedures with a bid mix). Sector: 41%.n = 219
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 29/09/2026.
Foreign bidders
In Netherlands · Architecture & engineering, 128 contracts went to foreign companies over the last 3 years (of 2,665 recorded awards) — mostly from Germany, France, United Kingdom.
Submission language: NLD.
Typical field: median 3 (from 18 awards).
What the buyer is looking for
The aim of the RWS Safety Culture Impulse is to make a team aware of their 'safety maturity', expressed on the safety culture ladder and to enable them to improve it through the action plan. In essence, the focus is less on ‘objectively’ establishing the exact level of the safety culture (if at all possible), but more on initiating a process. The VCI provides the teams with tools to improve the safety culture. For further information, see the tender documents. The framework agreement is for a period of 4 years (3 years with a possible extension of up to 1 year). Please refer to the field already filled in for the short description.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Vialis B.V. | 17 | 2024–2026 |
| Boskalis Nederland B.V. | 9 | 2024–2026 |
| Combinatie Leo ten Brinke | 9 | 2024–2025 |
| Fa. Gebr. van der Lee | 9 | 2015–2026 |
| Heijmans Infra B.V. | 7 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.