22606 | Project Management for New Construction of Office and Training Building in Rijen
22606 | Directievoering t.b.v. Nieuwbouw Kantoor- en Trainingsgebouw te Rijen
Netherlands · Den Haag · how to bid here →
Your path to submission
- Deadline: 4 November at 10:00 — 31 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (80 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to Smits Van Burgst Beveiliging B.V..n = 80
- The median procedure drew 3 bids (482 procedures with a bid count); 18% ended with a single bidder. Sector: median 5 bids.n = 482
- 13% of this buyer's awards went to companies that had already won here before (530 awards since 2015, spread over 171 companies). 87% went to new names.n = 530 awards since 2015
- 27% of the bids received came from small and medium-sized enterprises (221 procedures with a bid mix). Sector: 41%.n = 221
- 7% of awards went to companies from abroad (530 awards with a known winner country). Sector average: 8%.n = 530
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands · Architecture & engineering, 128 contracts went to foreign companies over the last 3 years (of 2,665 recorded awards) — mostly from Germany, France, United Kingdom.
Submission language: NLD.
Typical field: median 5 (from 73 awards).
What the buyer is looking for
Taking care of management for new office and training building at Gilze Rijen Air Base. The new building for the Royal Netherlands Air Force houses office and training rooms and supporting facilities. The building is part of the CLRS (Command Air and Space Forces) on Defence grounds. The training rooms include, in particular, spaces to prepare for primary business operations. The main tasks of the director are described in Annex ‘22606 - ABAA DNR - X-list - Management’ and in Annex ‘22606 - ABAA DNR - Terms of reference’. The Executive Director conducts the management in accordance with the UAV and represents the Client during the implementation and aftercare phase of the project. The starting point for the execution are the RAW and Stabu specifications based on the UAV. The building to be constructed comprises approximately 8000 m2 of BVO (approx. 45 X 100 m1). The new building consists…
Show full description
… partly of 2 floors with partly a basement. The main supporting structure consists of concrete and wood, the structural shell should be built as EMD shell: according to the principles of the ‘ faraday cage’ – the retention of electromagnetic radiation. The new building mainly concerns a building with complex installations on cooling, ventilation and measuring and control technology. The electrical installations consist mainly of: high and low voltage installation, data, fire safety and electronic security installation.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Heijmans Utiliteit B.V. | 6 | 2024–2026 |
| Hegeman Bouw & Infra B.V. | 5 | 2024–2025 |
| Smits Van Burgst Beveiliging B.V. | 5 | 2024–2026 |
| Unica Installatietechniek B.V. | 5 | 2023–2025 |
| Sweco Nederland B.V. | 4 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.