Nursing Home Neviandtstraße 87, Flooring
Altenpflegeheim Neviandtstraße 87, Bodenbeläge
Germany · Wuppertal · how to bid here →
Your path to submission
- Deadline: 2 November at 08:15 — 26 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 5 months (151 awards, most recently August 2026) — the next award is due around January 2027 by that rhythm. The last award went to Anlagenbau Faßhauer GmbH.n = 151
- 45% of this buyer's awards went to companies that had already won here before (352 awards since 2017, spread over 192 companies). 55% went to new names.n = 352 awards since 2017
- From notice to award takes a median 216 days here (16 procedures). Sector: 87 days.n = 16
- The median procedure drew 4 bids (278 procedures with a bid count); 14% ended with a single bidder. Sector: median 4 bids.n = 278
- The award came in at a median 84% of the estimated value (26 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 89%.n = 26
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Construction work, 672 contracts went to foreign companies over the last 3 years (of 242,267 recorded awards) — mostly from Austria, Poland, France.
Submission language: DEU.
Typical field: median 4 (from 149 awards).
What the buyer is looking for
Execution of flooring work as part of the renovation of the nursing home Neviandtstraße. Production of approximately 4,000 m2 of linoleum flooring, including approximately 2,400 m2 of linoleum and approximately 1,600 m2 of wood-look linoleum. Including surface preparation, sanding, priming and filling work on approx. 4,000 m2. Supply and installation of approximately 3,800 lfdm of solid baseboards as well as production of the required connection, sound and sealing joints. Including ancillary work, initial cleaning and protective covering of the finished floor surfaces.
What you must prove — eligibility criteria
Auf Anforderung sind innerhalb von 6 Kalendertagen einzureichen: – mindestens 3 Referenzen über vergleichbare und abgeschlossene Leistungen gleicher Größenordnung mit mindestens 100.000 € Baukosten netto aus den letzten 5 Jahren Zu jeder Referenz sind mindeste… ▸▾
Auf Anforderung sind innerhalb von 6 Kalendertagen einzureichen: - Berufs-/ Haftpflichtversicherungsnachweis mit Angaben der Haftpflichtdeckungshöhen: Die Haftpflichtversicherung mindestens folgende Deckungssummen für die Dauer des Vertrags einschließlich der … ▸▾
Auf Anforderung sind innerhalb von 6 Kalendertagen einzureichen: – Namentliche Benennung der/s Nachunternehmer/s – Angabe der Leistungsbereiche, die durch Nachunternehmer ausgeführt werden sollen Sofern sich der Bieter zum Nachweis seiner Eignung auf Nachunter… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SDH Bau GmbH · Dortmund | 7 | 2025–2026 |
| Gotthilf Benz Turngerätefabrik GmbH & Co. KG · Winnenden | 6 | 2025 |
| Vennes Erd- u. Tiefbau, Abbruch · Ratingen | 6 | 2025 |
| Kempen Krause Ingenieure GmbH | 6 | 2025 |
| BINZ Ambulance- und Umwelttechnik GmbH | 5 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.