Construction Works for the Murvica - Briševo Regional School
Radovi na izgradnji Područne škole Murvica - Briševo
Croatia · Zadar · how to bid here →
Your path to submission
- Deadline: 13 October at 11:00 — 10 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HRV.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew just one bid (45 procedures with a bid count); 62% ended with a single bidder. Sector: median 3 bids.n = 45
- 60% of this buyer's awards went to companies that had already won here before (277 awards since 2018, spread over 94 companies). 40% went to new names.n = 277 awards since 2018
- The award came in at a median 95% of the estimated value (182 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 93%.n = 182
- 6% of the bids received came from other countries (30 procedures with a bid mix) — all bidders, not just the winners. Sector: 2%.n = 30
- Across 10 procedures with structured selection criteria, this buyer most often required: References: works (10 of 10), Technical staff for execution (10 of 10), Trade register enrolment (10 of 10), Minimum annual turnover (4 of 10).n = 10
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Croatia · Construction work, 13 contracts went to foreign companies over the last 3 years (of 2,168 recorded awards).
Submission language: HRV.
Typical field: median 3 (from 2,175 awards).
What the buyer is looking for
The subject of the procurement are works on the construction of the Regional School Murvica-Briševo, all in accordance with the conditions and requirements of the procurement documents, the Main Project with all the corresponding maps, cost statement and technical specifications that are part of this procurement documentation. The subject-matter of the procurement is not divided into lots because it represents a technical, technological, design and functional unit representing a capital investment, so the tenderer is obliged to offer the subject-matter of the procurement in its entirety, i.e. the tender must cover all items of the cost statement which forms an integral part of this procurement document.
What you must prove — eligibility criteria
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| MAREX ELEKTROSTROJ d.o.o. | 29 | 2019–2026 |
| TRI BARTOLA d.o.o. | 13 | 2019–2023 |
| STRABAG d.o.o. | 11 | 2020–2023 |
| HP - Hrvatska pošta d.d. | 10 | 2018–2023 |
| Mediteran security doo | 8 | 2018–2023 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.