Implementation of EPC V action – energy savings of the Central Bohemia region
Realizace akce EPC V – energetické úspory Středočeského kraje
Czechia · Praha - Smíchov · how to bid here →
Your path to submission
- Deadline: 2 November at 10:30 — 29 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 10% of this buyer's awards went to companies that had already won here before (247 awards since 2010, spread over 85 companies). That is well below the sector norm (78%) — this buyer switches suppliers more often than others.n = 247 awards since 2010
- In this sector the buyer awards roughly every 3 months (44 awards, most recently April 2026) — by that rhythm the next award was due around July 2026. The last award went to ASITIS s.r.o..n = 44
- The median procedure drew 3 bids (185 procedures with a bid count); 21% ended with a single bidder. Sector: median 4 bids.n = 185
- The award came in at a median 80% of the estimated value (30 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 76%.n = 30
- 73% of the bids received came from small and medium-sized enterprises (57 procedures with a bid mix). Sector: 92%.n = 57
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Czechia · Architecture & engineering, 449 contracts went to foreign companies over the last 3 years (of 15,807 recorded awards) — mostly from Germany, France, Austria.
Submission language: CES.
Typical field: median 2 (from 38 awards).
What the buyer is looking for
Under the contract, a proposal for energy-saving measures will be drawn up by the service provider. The implementation of energy-saving measures within the meaning of this contract shall include the following: • elaboration of project documentation and provision of other activities for securing building permits for the implementation of savings measures, if, according to the bid of the participant, they are necessary with regard to the proposed measures and if the documentation has not been provided by the contracting authority, • all engineering activities, in particular the processing of the requirements associated with obtaining a building permit, • elaboration of implementing project documentation for the implementation of savings measures, • delivery and assembly of the proposed savings measures on a turnkey basis, • energy management (services involving continuous monitoring and…
Show full description
… evaluation of achieved energy savings) for the duration of the contractual relationship, including inspection of the installed equipment.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Your System; spol. s r.o. | 3 | 2015 |
| ENESA a.s. | 3 | 2024 |
| D-energy s.r.o. | 3 | 2024 |
| O2 Czech Republic a.s. | 3 | 2015–2024 |
| Vodohospodářský rozvoj a výstavba a.s. | 3 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.