Planning for the Barcs Dráva Border Bridge Renovation
Barcsi Dráva-határhíd felújításhoz tervezés
Hungary · Budapest · how to bid here →
Your path to submission
- Deadline: 30 October at 11:00 — 27 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HUN.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (127 awards, most recently June 2026) — by that rhythm the next award was due around September 2026. The last award went to Cardium Építőipari Kft..n = 127
- The median procedure drew 3 bids (744 procedures with a bid count); 22% ended with a single bidder. Sector: median 5 bids.n = 744
- 34% of this buyer's awards went to companies that had already won here before (794 awards since 2018, spread over 194 companies). 66% went to new names.n = 794 awards since 2018
- 63% of the bids received came from small and medium-sized enterprises (465 procedures with a bid mix). Sector: 90%.n = 465
- 10% of awards went to companies from abroad (794 awards with a known winner country). Sector average: 4%.n = 794
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Hungary · Architecture & engineering, 25 contracts went to foreign companies over the last 3 years (of 1,101 recorded awards) — mostly from Germany, United Kingdom, France.
Submission language: HUN.
Typical field: median 5 (from 127 awards).
What the buyer is looking for
Carrying out the necessary design for the renovation of the Barcsi Dráva border bridge (as a road bridge suitable for the transfer of motor traffic). Preparation of the refurbishment plan of the named 1 bridge at the level of the construction plan. Documents to be prepared: general plan - technical description - declaration of the designer - calculation of dimensions and quantities - budget notice - corrosion protection plan of the bridge structure - detail plan of the renovation of the poles - plan of the renovation of the pillars, pillar protection, foundation protection - cladding technology expert opinion, examination of the asphalt and bridge insulation - track plate balancing plan - detail plans (priority bridge border cross section, cross leaking, slipping, stairs, railing, lighting ) - plan of signs for the management of water transport - compensation plate replacement plan -…
Show full description
… plan of the connecting road structure, length gauge, cross sections - temporary traffic order plan - final traffic order plan - digital file of the design documentation in one copy (doc, xls, plans in dwg format) - submission of complete documentation in Croatian as well Tasks to be carried out during the design: In the vicinity of a bridge, bed-taking is required, in the vicinity of pillars, the geometry of the bed-bottom must be mapped in a raster of no more than 5 × 5 m. The bed recording shall be made at a distance of 75 m from the axis of the bridge on the influencing side and 25 m from the outlet side. It shall be measured up to a maximum of 2,5 x 2,5 m grid within 25 m of the bridge axis. - geodesy measurement, bridge shape determination required, from 6/262+137 km, bridgehead on both sides + 50 m length - pavement excavation to determine the real track layer order - design of the complete refurbishment of the corrosion protection of the steel structure, examination of the conformity of the existing paint system, (for carrying out the necessary tests for a mobile bridge inspection trolley ) - design of the complete insulation and pavement replacement, - condensation and rearrangement of sinkholes, design of the construction of pavement leaks, - complete pavement replacement (including its implications: replacement of railings and candelabras, replacement of luminaires for leds, preparation of salt protection) and design of insulation under the pavement, - design of conductor railings on both sides - design of replacement of dilatation structures - on ducts: Preparation of anti-corrosion protection on the knee walls of bridgeheads and on the covering walls, design of concrete surface repair - design of pillar protection - design of refurbishment of utility shafts - preparation of the construction permit plan for the installation of signs for the management of water transport (planning of the power supply of ) - Replacement of the entire internal and external lighting system of the bridge to be planned, with Croatian side current supply, Hungarian side reserve supply possibility - We request a traffic engineering plan during construction, broken down according to the construction schedule, together with pre-signalling and deflection boards for roads connecting on the Hungarian side. Further information on the bridge involved in the design: Natura 2000 is the area under the bridge (river Dráva, hrsz 094). The contracting authority must agree with the Croatian party the evaluation and final design documentation, therefore the technically relevant parts of the design documentation (plan sheets, technical specifications - with the exception of the annexes) must be drawn up in both Croatian and Hungarian.
What you must prove — eligibility criteria
M.1. A 321/2015. (X. 30.) Korm. rendelet 21. § (3) bekezdés a) pontja alapján -figyelemmel a korm. rendelet (3a) bekezdés a) pontjára alkalmas az ajánlattevő, amennyiben rendelkezik az eljárást megindító felhívás feladásának napjától visszafelé számított 3 évb… ▸▾
M.2. A 321/2015. (X. 30.) Korm. rendelet 21. § (3) bekezdés b) pontja alapján alkalmas az ajánlattevő (továbbiakban: AT), amennyiben rendelkezik min. 1 fő tervező "hídszerkezeti tervező" szakemberrel, aki a 266/2013. (VII. 11.) Korm. rendelet szerinti „HT” (va… ▸▾
SZ.1) A Kbt. 65. § (1) bekezdés c) pontja és a 322/2015. (X. 30.) Korm. rendelet 8. § (1) bekezdés c) pontja alapján alkalmas az Ajánlattevő, ha az építési beruházáshoz kapcsolódó tervezői szolgáltatás tárgya szerint illetékes országos szakmai kamarai névjegyz… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Colas Út Építőipari Zártkörűen Működő Részvénytársaság | 12 | 2023–2026 |
| "Soltút" Útépítő, Fenntartó és Kereskedelmi Korlátolt Felelősségű Társaság | 11 | 2023–2026 |
| UTIBER Közúti Beruházó Kft | 10 | 2023–2026 |
| SPECIÁLTERV Építőmérnöki Korlátolt Felelősségű Társaság | 10 | 2023–2026 |
| STRABAG Általános Építő Korlátolt Felelősségű Társaság | 10 | 2023–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.