ENGINEERING (DESIGN AND SUPERVISION, DELIVERY, INSTALLATION AND COMMISSIONING) FOR THE EXPANSION OF THE ELECTRIC VEHICLE CHARGING STATION NETWORK IN THE TERRITORY OF BURGAS MUNICIPALITY
ИНЖЕНЕРИНГ (ПРОЕКТИРАНЕ И АВТОРСКИ НАДЗОР, ДОСТАВКА, МОНТАЖ И ВЪВЕЖДАНЕ В ЕКСПЛОАТАЦИЯ) ЗА НАДГРАЖДАНЕ НА МРЕЖАТА ОТ ЗАРЯДНИ СТАНЦИИ ЗА ЕЛЕКТРОМОБИЛИ НА ТЕРИТОРИЯТА НА ОБЩИНА БУРГАС
Bulgaria · гр. Бургас · how to bid here →
Your path to submission
- Deadline: 26 October at 23:59 — 24 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: BUL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The award came in at a median 55% of the estimated value (203 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 80%.n = 203
- 73% of this buyer's awards went to companies that had already won here before (2,750 awards since 2014, spread over 482 companies). 27% went to new names.n = 2,750 awards since 2014
- The median procedure drew 2 bids (2,160 procedures with a bid count); 50% ended with a single bidder. Sector: median 3 bids.n = 2,160
- 30% of the bids received came from small and medium-sized enterprises (774 procedures with a bid mix). Sector: 7%.n = 774
- 3% of awards went to companies from abroad (2,750 awards with a known winner country). Sector average: 0%.n = 2,750
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Bulgaria · Electrical machinery, 1 contracts went to foreign companies over the last 3 years (of 2,365 recorded awards).
Submission language: BUL.
Typical field: median 3 (from 1,956 awards).
What the buyer is looking for
The subject-matter of the contract was ‘ENGINEERING (PRODUCTION AND AUTHORITIES' SURVEILLANCE, DELIVERY, INSTALLATION AND IMPLEMENTATION IN EXPOSURE) TO PROMOTE THE NETWORK OF BURGAS MUNICIPALITY ELECTROMOBILITY STATIONS’. The activities covered by the contract are: ACTIVITY 1: Design and supervision – preparation of a technical investment project, execution of a system design and preparation of a Technical Design Report and exercise of author’s supervision during the execution of the construction and installation works. ACTIVITY 2: Upgrading the network of charging stations for electric vehicles on the territory of Burgas Municipality – including works for the construction of electrical and communication infrastructure, supply and installation, integration, testing, commissioning, warranty and operational maintenance of the network of built charging locations. ACTIVITY 3: Providing…
Show full description
… one-time licenses for access to a system for management and monitoring of electric vehicle charging services and integration. In the execution of the order, exact compliance with the set and approved technical parameters is mandatory. The public procurement is implemented within the project №101104610 LIFE22-IPC-BG-LIFE-SIP CLIMA-SUMP, funded by the LIFE Programme of the European Union and with funds from the budget of the Municipality of Burgas.
What you must prove — eligibility criteria
1. Необходимите за изпълнението на поръчката строително-монтажни работи следва да бъдат осъществявани/изпълнени от правоспособно/и лице/а /строител/ по смисъла на чл. 163, ал. 1 от ЗУТ, който/които имат право да изпълняват строежи категория 5, съгласно чл.137,… ▸▾
Участниците в обществената поръчка следва да са реализирали минимален общ оборот за последните три приключили финансови години или по-кратък период в зависимост от датата, на която участникът е създаден или е започнал дейността си в размер на двукратния размер… ▸▾
Участниците следва да притежават опит в изпълнението на дейности с предмет и обем идентични или сходни с тези на поръчката, изпълнени през последните 3 (три) години, считано от датата на подаване на офертата. Под „дейности с предмет и обем, идентични или сходн… ▸▾
Участниците следва да разполагат с персонал и/или с ръководен състав с определена професионална компетентност за изпълнението на поръчката, които притежават професионална квалификация и опит, както следва: Ключови експерти: • Ръководител на екипа: Образование … ▸▾
Участниците следва да имат разработена, внедрена и сертифицирана система за управление на околната среда по стандарт EN ISO 14001:2015 или еквивалент с предметен обхват, свързан с изграждане, поддръжка и мониторинг на зарядни станции за електромобили или еквив… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ДИ ЕМ АЙ ДИВЕЛОПМЪНТ ЕООД | 173 | 2018–2026 |
| ИНОВАЦИОННИ СИСТЕМИ - БУРГАС ЕООД | 159 | 2019–2026 |
| ЕН АР КОНСУЛТ ЕООД | 94 | 2019–2026 |
| ЧИСТОТА ЕООД | 84 | 2020–2026 |
| ИНФРА ЕКСПЕРТ АД | 81 | 2018–2026 |