DEA 42461 - Study, procurement of equipment and installation (turnkey project) of a 400/150/20 kV switching station in the Rouf area of Athens
ΔΕΑ 42461 - Μελέτη, προμήθεια εξοπλισμού και εγκατάσταση (έργο με το κλειδί στο χέρι) ενός ΚΥΤ 400/150/20 kV στην περιοχή Ρουφ Αθηνών
Greece · ΑΘΗΝΑ · how to bid here →
Your path to submission
- Deadline: 2 November at 14:00 — 29 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ELL, ENG.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- Across 9 procedures with structured selection criteria, this buyer most often required: References: works (8 of 9), Staff qualifications (7 of 9), Professional register enrolment (7 of 9), Independent quality certificate (e.g. ISO 9001) (4 of 9).n = 9
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Greece · Construction work, 126 contracts went to foreign companies over the last 3 years (of 53,406 recorded awards) — mostly from Italy, Germany, Albania.
Submission language: ELL.
Typical field: median 1 (from 20,354 awards).
What the buyer is looking for
CMP 42461 - Design, supply of equipment and installation (turnkey project) of a 400/150/20 kV hotspot in Rouf area, Athens
Selection criteria — not structured in the notice
The buyer left the criteria block of the EU form empty; the eligibility requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Greek, English.