Prior Notice (2nd publication), Basic renovation and expansion works of Tali football hall

Ennakkoilmoitus (2. julkaisu), Talin jalkapallohallin perusparannus ja laajennustyöt

Finland · HELSINGIN KAUPUNKI · how to bid here →

Your path to submission

  1. Deadline: 30 October at 21:59 — 28 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: FIN.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (287 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Louhintahiekka Oy.n = 287
  • 36% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 75%.n = 10
  • 55% of this buyer's awards went to companies that had already won here before (1,452 awards since 2018, spread over 520 companies). 45% went to new names.n = 1,452 awards since 2018
  • The median procedure drew 5 bids (1,093 procedures with a bid count); 8% ended with a single bidder. Sector: median 4 bids.n = 1,093
  • The award came in at a median 93% of the estimated value (92 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 91%.n = 92

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 03/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Finland · Construction work, 5 contracts went to foreign companies over the last 3 years (of 4,787 recorded awards).

Submission language: FIN.

Typical field: median 5 (from 185 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

This notification is a pre-notification. This notice is not a contract notice, a call for tenders or a call for competition. This pre-notification changes the information provided in the previous pre-notification on the schedule of the project. The previous notice was published on the Procurement Notices.fi website on 11 June. between 6.8.2026 and 6.8.2026. The purpose of the pre-notification is to provide the market with prior information on the future procurement. In accordance with the previous pre-notification, the City of Helsinki is planning the renovation and extension of the Tali football hall as a project management contract. The site, located in the Munkkiniemi district (address Purotie 8, 00380 Helsinki), is a football hall to be renovated and expanded with the construction contract being procured. The planned area of the existing building to be renovated is 10860 gross square…

Show full description

… metres. The planned area of the extension is 2431 gross square metres. Contrary to the previous pre-announcement, the roof repairs of the football hall will be excluded from the project. In a previous notice, roof repairs had been announced as a possible option, but in a future notice, roof repairs are not related to the contract, even as an option. According to the previous updated project schedule, the aim of the procurement and the contract is to proceed with the following schedule during the rest of 2026: 1. Call for tenders published during October 2. Deadline for submission in early December 3. The procurement decision before Christmas The aim is to conclude the procurement contract soon after the turn of the year in January 2027.

Machine translation (EU eTranslation) — official wording via the PDF link.

Selection criteria — via the ESPD

The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Finnish.

Contract

BuyerHelsingin kaupunki, kaupunkiympäristön toimiala
TypeWorks
Estimated valuevalue not published
Published29 September 2026
CategoryConstruction work · CPV 45000000

Who has won here before

CompanyAwardsPeriod
Ramboll Finland Oy322022–2026
Linea Konsultit Oy (1639698-6)//Ramboll Finland Oy (0101197-5)//Sitowise Oy · ESBO322020–2026
SITOWISE OY312022–2026
Peab Oy232020–2025
AFRY Finland Oy (0625905-6)//Ramboll Finland Oy222020–2025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20206
202159
2022105
2023157
2024174
2025221
2026158

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Friday 30 October at 21:59

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →