Framework Agreement Communication Urbanisation Alliance
Raamovereenkomst Communicatie Verstedelijkingsalliantie
Netherlands · Delft · how to bid here →
Your path to submission
- Deadline: 27 October at 10:59 — 24 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 7 months (4 awards, most recently July 2026) — the next award is due around February 2027 by that rhythm. The last award went to Ilge Subscription Management B.V..n = 4
- 0% of this buyer's awards went to companies that had already won here before (498 awards since 2015, spread over 47 companies). That is well below the sector norm (28%) — this buyer switches suppliers more often than others.n = 498 awards since 2015
- The award came in at a median 112% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too low here. Sector: 84%.n = 8
- 72% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 34%.n = 10
- 13% of awards went to companies from abroad (498 awards with a known winner country). Sector average: 4%.n = 498
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Netherlands · Business services, 192 contracts went to foreign companies over the last 3 years (of 6,493 recorded awards) — mostly from France, Germany, United Kingdom.
Submission language: NLD.
Typical field: median 2 (from 3 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (NL).
Show original description (NL)
zie document
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| BK Ingenieurs | 2 | 2025 |
| Aannemingsbedrijf G. van der Ven B.V. | 1 | 2024 |
| Medipoint WMO B.V. | 1 | 2023 |
| Iv-Infra B.V. | 1 | 2024 |
| Noordzij Beschermingsbewind B.V. | 1 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.