(ProVia-ID 160877) Schaftenau - Radfeld Junction, four-track expansion; (Phase 1); Construction; Alliance contract consultant for construction, business management and risk
(ProVia-ID 160877) Schaftenau - Knoten Radfeld, viergleisiger Ausbau; (Phase 1); Bau; Berater Allianzvertrag für Bauwirtschaft, Betriebswirtschaft und Risiko
Austria · Wien · how to bid here →
Your path to submission
- Deadline: 15 October at 12:00 — 12 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (282 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to EMR Ingenieurbüro für Elektrotechnik.n = 282
- 28% of this buyer's awards went to companies that had already won here before (1,761 awards since 2015, spread over 583 companies). 72% went to new names.n = 1,761 awards since 2015
- The median procedure drew 3 bids (1,201 procedures with a bid count); 26% ended with a single bidder. Sector: median 4 bids.n = 1,201
- 28% of awards went to companies from abroad (1,761 awards with a known winner country). Sector average: 16%.n = 1,761
- 60% of the bids received came from small and medium-sized enterprises (193 procedures with a bid mix). Sector: 80%.n = 193
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Austria · Architecture & engineering, 409 contracts went to foreign companies over the last 3 years (of 2,797 recorded awards) — mostly from Germany, Italy, Poland.
Submission language: DEU.
Typical field: median 2 (from 234 awards).
What the buyer is looking for
The subject of the award is the provision of consultancy services in the fields of construction, business administration and risk management for the development, tendering, awarding and, optionally, the implementation of an alliance contract model in the project ‘4-track expansion Schaftenau – Radfeld node’. In Phase I, the basic service includes technical support for the tendering and awarding phase for the main construction lots T3.1 and T4.1, including the design of the alliance contract, the development of target cost and remuneration models, opportunity and risk management, and support for the procurement procedure. The options in Phase I are consulting services for the development of an alliance contract model for the main construction lot T2.1 and in Phase II consulting and support services during the implementation or construction phase of the main construction lots T2.1, T3.1 and T4.1.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in German.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| PORR Bau GmbH · 8141 AT | 29 | 2022–2026 |
| Swietelsky AG | 27 | 2022–2026 |
| European Trans Energy GmbH · Wien | 21 | 2022–2026 |
| STRABAG AG | 19 | 2022–2026 |
| Siemens Mobility Austria GmbH | 16 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.