Friedrich & ClementBETA

Construction of Pikksilla bridge located at km 46.845 on State Road No. 52 Viljandi-Rõngu and reconstruction of the road section at km 46.2-47.25

Riigitee nr 52 Viljandi-Rõngu km 46,845 asuva Pikksilla silla ehitus ja km 46,2-47,25 teelõigu rekonstrueerimine

Estonia · Tallinn · how to bid here →

Your path to submission

  1. Deadline: 30 October at 13:00 — 26 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: EST.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (68 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to Verston Eesti OÜ.n = 68
  • 46% of this buyer's awards went to companies that had already won here before (502 awards since 2021, spread over 129 companies). 54% went to new names.n = 502 awards since 2021
  • The median procedure drew 6 bids (485 procedures with a bid count); 8% ended with a single bidder. Sector: median 5 bids.n = 485
  • 31% of the bids received came from other countries (357 procedures with a bid mix) — all bidders, not just the winners. Sector: 43%.n = 357
  • 10% of awards went to companies from abroad (502 awards with a known winner country). Sector average: 5%.n = 502

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Estonia · Construction work, 26 contracts went to foreign companies over the last 3 years (of 770 recorded awards) — mostly from Finland, France, Italy.

Submission language: EST.

Typical field: median 4 (from 68 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Construction of the Pikksild bridge at km 46.845 of State road No 52 Viljandi-Rõngu and reconstruction of the section of road at km 46.2-47.25 in accordance with the conditions laid down in the procurement documents. / Grounds for exclusion and selection criteria: See procurement documents

Machine translation (EU eTranslation) — official wording via the PDF link.

Selection criteria — via the ESPD

The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Estonian.

Contract

BuyerTranspordiamet
TypeWorks
Estimated value6.900.000 €
Published28 September 2026
CategoryConstruction work · CPV 45221100

Who has won here before

CompanyAwardsPeriod
Hot Est OÜ172024–2026
Aktsiaselts Teede Tehnokeskus172024–2026
OÜ Novica152025–2026
AS TREV-2 Grupp102024–2026
Sweco PM Estonia OÜ102026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

2024112
2025182
2026152

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Friday 30 October at 13:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →
Construction of Pikksilla bridge located at km 46.845 on State Road No — Friedrich & Clement