Supply of small materials
Dobava drobnega materiala
Slovenia · Celje · how to bid here →
Your path to submission
- Deadline: 3 November at 10:00 — 30 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SLV.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (7 awards, most recently September 2026) — the next award is due around January 2027 by that rhythm. The last award went to IMP, d.d., družba za svetovanje, projektiranje, inženiring in gradnjo.n = 7
- 24% of this buyer's awards went to companies that had already won here before (948 awards since 2017, spread over 263 companies). 76% went to new names.n = 948 awards since 2017
- The median procedure drew 2 bids (881 procedures with a bid count); 50% ended with a single bidder. Sector: median 3 bids.n = 881
- The award came in at a median 89% of the estimated value (151 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 78%.n = 151
- 11% of awards went to companies from abroad (948 awards with a known winner country). Sector average: 5%.n = 948
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Clement
When comparable contracts were last awarded here, usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Foreign bidders
In Slovenia · Construction materials, 14 contracts went to foreign companies over the last 3 years (of 281 recorded awards).
Submission language: SLV.
Typical field: median 2 (from 7 awards).
Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovenian.
Eligibility analysis from the tender documents
Contract
BuyerDRUŽBA ZA AVTOCESTE V REPUBLIKI SLOVENIJI D.D.
TypeSupplies
Estimated valuevalue not published
Published28 September 2026
CategoryConstruction materials · CPV 44111000
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Zavod za gradbeništvo Slovenije | 11 | 2024–2026 |
| POMGRAD, gradbeno podjetje d.d. | 10 | 2024–2026 |
| KOLEKTOR CESTNO PODJETJE NOVA GORICA, Družba za vzdrževanje in gradnjo cest, d.o.o. | 10 | 2024–2026 |
| RIKO RIBNICA d.o.o. Ribniška industrija kovinske opreme | 9 | 2024–2026 |
| CGP, družba za gradbeništvo, inženiring, proizvodnjo in vzdrževanje cest, d.d. | 9 | 2024–2026 |
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.
How often this buyer tenders this
20242
20254
202610
Who knows the rhythm prepares instead of reacting.
·
days until the deadline — Tuesday 3 November at 10:00
How to bid
Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Tender documents — direct download
Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →