Supply, Assembly and Commissioning of Electrical Equipment MT/SA/SPCC of the New Ponta Delgada Substation 30/6.6 kV
Fornecimento, Montagem e Comissionamento de Equipamentos Elétricos MT/SA/SPCC da Nova Subestação da Ponta Delgada 30/6,6 kV
Portugal · Freguesia de Santa Maria Maior (Funchal) · how to bid here →
Your path to submission
- Deadline: 19 October at 23:59 — 19 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POR.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 56% of this buyer's awards went to companies that had already won here before (309 awards since 2013, spread over 126 companies). That is well above the sector norm (30%) — newcomers have a harder time here than elsewhere.n = 309 awards since 2013
- The award came in at a median 88% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 8
- The median procedure drew 2 bids (16 procedures with a bid count); 44% ended with a single bidder. Sector: median 2 bids.n = 16
- 1% of awards went to companies from abroad (309 awards with a known winner country). Sector average: 8%.n = 309
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Portugal · Electrical machinery, 16 contracts went to foreign companies over the last 3 years (of 255 recorded awards).
Submission language: POR.
Typical field: median 2 (from 233 awards).
What the buyer is looking for
Acquisition of services of supply, assembly and commissioning of medium voltage electrical equipment, automation systems (SA) and supervision, control and data acquisition (SPCC) for the new substation of Ponta Delgada 30/6.6 kV, including supplies, assemblies and tests of all equipment, systems and materials necessary for the operation of the substation, as defined in the respective Implementation Project.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Portuguese.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| MC-COMPUTADORES,S.A. | 15 | 2014–2026 |
| Cabelte - Cabos Eléctricos e Telefónicos, S.A | 14 | 2014–2026 |
| João Crisóstomo Figueira da Silva, S.A. | 13 | 2013–2023 |
| Obracentimetro - Construção Civil, Lda. | 11 | 2018–2026 |
| Santos & Ornelas, Lda | 9 | 2015–2026 |