Friedrich & ClementBETA

Construction Contract for the Command Building of the New Ponta Delgada Substation 30/6.6 kV

Empreitada de Construção do Edifício de Comando da Nova Subestação da Ponta Delgada 30/6,6 kV

Portugal · Freguesia de Santa Maria Maior (Funchal) · how to bid here →

Your path to submission

  1. Deadline: 13 October at 23:59 — 11 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: POR.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 56% of this buyer's awards went to companies that had already won here before (309 awards since 2013, spread over 126 companies). That is well above the sector norm (38%) — newcomers have a harder time here than elsewhere.n = 309 awards since 2013
  • The median procedure drew 2 bids (16 procedures with a bid count); 44% ended with a single bidder. Sector: median 4 bids.n = 16
  • The award came in at a median 88% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 91%.n = 8
  • 1% of awards went to companies from abroad (309 awards with a known winner country). Sector average: 3%.n = 309

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Portugal · Construction work, 16 contracts went to foreign companies over the last 3 years (of 1,029 recorded awards).

Submission language: POR.

Typical field: median 4 (from 3 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Construction of the command building of the new substation of Ponta Delgada 30/6.6 kV, the transformer cell and the external arrangements of the new substation of Ponta Delgada, considering the technical installations, namely: BT electrical infrastructure, telecommunications, fire safety, SADIR, HVAC and general earth network, to be carried out in accordance with the terms and conditions of the specifications.

Machine translation (EU eTranslation) — official wording via the PDF link.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Portuguese.

Contract

BuyerEEM - Empresa de Electricidade da Madeira, SA
TypeWorks
Estimated value2.850.000 €
Published28 September 2026
CategoryConstruction work · CPV 45232200

Who has won here before

CompanyAwardsPeriod
MC-COMPUTADORES,S.A.152014–2026
Cabelte - Cabos Eléctricos e Telefónicos, S.A142014–2026
João Crisóstomo Figueira da Silva, S.A.132013–2023
Obracentimetro - Construção Civil, Lda.112018–2026
Santos & Ornelas, Lda92015–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.
·
days until the deadline — Tuesday 13 October at 23:59

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →
Construction Contract for the Command Building of the New Ponta Delgad — Friedrich & Clement