Service Requirements for Topographical Surveys for the Clonmel Link Roads
Ireland · Clonmel, Nenagh · how to bid here →
Your path to submission
- Deadline: 23 October at 14:00 — 20 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (140 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to Cooney Architects Ltd.n = 140
- 50% of this buyer's awards went to companies that had already won here before (977 awards since 2014, spread over 424 companies). That is well above the sector norm (37%) — newcomers have a harder time here than elsewhere.n = 977 awards since 2014
- The median procedure drew 5 bids (902 procedures with a bid count); 18% ended with a single bidder. Sector: median 6 bids.n = 902
- The award came in at a median 84% of the estimated value (18 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 97%.n = 18
- 2% of awards went to companies from abroad (977 awards with a known winner country). Sector average: 5%.n = 977
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Ireland · Architecture & engineering, 381 contracts went to foreign companies over the last 3 years (of 8,385 recorded awards) — mostly from United Kingdom, Spain, France.
Submission language: ENG.
Typical field: median 4 (from 128 awards).
What the buyer is looking for
Service Requirements for Topographical Survey for the Clonmel Link Roads
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in English.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| John Ryan Construction Ltd | 35 | 2016–2024 |
| Rathcabin Tarmacadam Ltd | 20 | 2019–2026 |
| lazerline construction ltd | 17 | 2019–2024 |
| Glas Civil Engineering Ltd | 16 | 2016–2025 |
| Tony Kirwan Civil Engineering | 14 | 2017–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.