Friedrich & ClementBETA

(ProVia-ID 161711) UW Landeck; UW Landeck - Masonry Works

(ProVia-ID 161711) UW Landeck; UW Landeck - Baumeisterarbeiten

Austria · Wien · how to bid here →

Your path to submission

  1. Deadline: 12 October at 13:00 — 8 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: DEU.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 28% of this buyer's awards went to companies that had already won here before (1,761 awards since 2015, spread over 583 companies). 72% went to new names.n = 1,761 awards since 2015
  • The median procedure drew 3 bids (1,204 procedures with a bid count); 25% ended with a single bidder. Sector: median 4 bids.n = 1,204
  • 63% of the bids received came from small and medium-sized enterprises (196 procedures with a bid mix). Sector: 34%.n = 196
  • 28% of awards went to companies from abroad (1,761 awards with a known winner country). Sector average: 17%.n = 1,761
  • 9% of the bids received came from other countries (196 procedures with a bid mix) — all bidders, not just the winners. Sector: 0%.n = 196

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Austria · Construction work, 941 contracts went to foreign companies over the last 3 years (of 6,282 recorded awards) — mostly from Germany, France, Italy.

Submission language: DEU.

Typical field: median 3 (from 285 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The project in question involves the construction of a new substation at the same site with third-way switch-off capability and the use of a mobile substation. The new building consists of a 15 kV switchgear building and maintenance/scaffolding room, a 15 kV metal-encapsulated system, a 110 kV open-air switchgear with three 110/15 kV transformers, a 15 kV switchgear with cable collector including all ancillary equipment. The Landeck substation will be renewed on site in 2 construction phases. During the 1st With one third of the existing plant, an fUW and the existing overhead contact line switchgear will continue to operate during the conversion phase. During this time, the 110 kV Pettneu 2 – Ötztal 2 traction power line will be ground through at the OB mast No Ld 2. The front part (U3) and the middle part (U2) of the installation shall be decommissioned. After the new construction of…

Show full description

… the front 2 thirds (U3, U2) of the open-air system and its commissioning with the new 15 kV system, including a new switchgear, the rear third (U1) will be rebuilt. In this 2. During the conversion phase, the 110 kV Pettneu 1 – Ötztal 1 traction power line will be sanded through at U-line mast No Ld 1. The new 110 kV open-air switchgear is designed in series-longitudinal design as a double busbar system with overhead busbar and 2 longitudinal divisions with coupling. The transformers are delivered to the system on a track-bound basis. The entire earthing system for all parts of the system is installed in accordance with the applicable regulations and standards, taking into account the ÖBB regulations and the technical specifications for switchgear. The substation building complies with building class 1 in accordance with the valid OIB guidelines. Surface drainage of paved surfaces, including roads, is carried out by leaching on its own land. The roof water is discharged into a newly manufactured leaching shaft and brought to its own bottom for leaching. The new premises do not provide for a permanent workplace. The following existing parts of the plant will be renewed: 15-kV-UW shifting scaffold. Complete 110 kV open air switchgear. UW – Track. UW building. All work shall be carried out taking into account the existing infrastructure, applicable standards and project-specific requirements. The planning services include the preparation of position and section plans, static proofs, formwork and reinforcement plans as well as specifications for the subsequent tendering of the construction services.

Machine translation (EU eTranslation) — official wording via the PDF link.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in German.

Contract

BuyerÖBB-Infrastruktur AG
TypeWorks
Estimated valuevalue not published
Published25 September 2026
CategoryConstruction work · CPV 45232220

Who has won here before

CompanyAwardsPeriod
PORR Bau GmbH · 8141 AT292022–2026
Swietelsky AG272022–2026
European Trans Energy GmbH · Wien212022–2026
STRABAG AG192022–2026
Siemens Mobility Austria GmbH162022–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202260
2024224
2025259
2026180

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 12 October at 13:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →