Environmental development of Bem square
Bem tér környezeti fejlesztése
Hungary · Debrecen · how to bid here →
Your path to submission
- Deadline: 13 October at 12:00 — 9 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HUN.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 3% of this buyer's awards went to companies that had already won here before (276 awards since 2017, spread over 44 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 276 awards since 2017
- In this sector the buyer awards roughly every 6 months (7 awards, most recently April 2026) — the next award is due around October 2026 by that rhythm. The last award went to TÖMB 2002 Szolgáltató Korlátolt Felelősségű Társaság.n = 7
- 16% of awards went to companies from abroad (276 awards with a known winner country). Sector average: 3%.n = 276
- The median procedure drew 4 bids (234 procedures with a bid count); 12% ended with a single bidder. Sector: median 5 bids.n = 234
- 85% of the bids received came from small and medium-sized enterprises (51 procedures with a bid mix). Sector: 68%.n = 51
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,299 recorded awards).
Submission language: HUN.
Typical field: median 3 (from 7 awards).
What the buyer is looking for
Environmental development of Bem Square as part of project TOP_PLUSZ-1.3.2-23-DE1-2025-00001. The total size of the development area included in the green space reconstruction in the northern and southern development areas is 12520 m2, of which 8900 m2 is the size of the renewable or newly developed green space. Grounds for exclusion from bidding for lots: On the basis of a combined and complex examination of the economic, technical, quality and organisational aspects related to the performance of the contract, the Contracting Authority concluded that, in the case of the green space reconstruction and public space development projects subject to public procurement, consisting of several elements, the provision of bidding for lots is not compatible with the proper, uniform quality and timely implementation of the investment. The development is a complex landscaping and infrastructure…
Show full description
… development investment based on a unified concept, which includes planting works, the construction of the irrigation system, cladding construction tasks, the installation of playground and street furniture elements, interventions of a hydro-construction nature (renovation of the fountain, drainage of rainwater) and the installation of the public safety system (camera). These elements are built on each other technically and functionally, they interact closely with each other, and treating them as separate parts would jeopardise the uniform operability of the investment. The individual types of work of the investment are not carried out independently, but as a prerequisite for each other's implementation and as a system built on each other. For example, planting works are directly linked to the construction and commissioning of the irrigation system, as the sustainability of the planted crop can only be ensured if the irrigation system is properly designed and regulated. The pavement construction works are also closely related to storm water management solutions, as the construction of pavement and asphalt pavements must ensure the drainage and desiccant of rainwater towards green surfaces. The installation of playground equipment, street furniture, surveillance cameras and other public space equipment can also be carried out in accordance with the final landscaping, utilities and pavement construction works. Due to this degree of interconnectedness of construction processes, the division of works into specialised or functional parts would result in disproportionate coordination and technical risks. The contracting authority has a single construction plan documentation covering the entire project, which includes the coordinated design of the green surface system, water management solutions, the pavement structure and public space equipment. The design documentation uses integrated technical solutions (especially the connection between plant surfaces and the irrigation system, the dehydration system of paved surfaces and rainwater drainage, and the connection of parts of the area with different functions) which, if broken, would make the coordination of the implementation significantly more difficult and risk inappropriate fits or technical incompatibilities. The construction workflows are closely intertwined in time and space. Earthworks, utilities and water construction tasks, cladding constructions and plantings are mutually dependent activities. The co-existence of several contractors in the work area would result in a significant additional coordination burden, in particular as regards the transfer of work areas, temporary traffic management solutions and the coordination of different specialised works. Due to the nature of the area affected by the development – a public area in residential environment and in continuous use – a single organisation is particularly justified, which ensures uninterrupted construction, minimises the burden on the population and avoids the risk of accidents. The exclusion of the partial bid is also justified by the fact that the topographical numbers indicated in the call are not consecutive
What you must prove — eligibility criteria
Az alkalmasság minimumkövetelménye(i): P.1.) Alkalmatlan az ajánlattevő, ha az ajánlattevőnek a közbeszerzés tárgyából (zöldterület fejlesztés és/vagy zöldterület rekonstrukció és/vagy útburkolat építés és/vagy útépítés és/vagy elektromos eszköz (kamera) telep… ▸▾
Az alkalmasság minimumkövetelménye(i): M.1.) Ajánlattevő alkalmatlan a szerződés teljesítésére, ha nem rendelkezik az eljárást megindító felhívás feladásának napjától visszafelé számított – a 321/2015. (X. 30.) Korm. rendelet 21. § (2a) bekezdés a) pontja alap… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ARCHI-BAR Építész Stúdió Korlátolt Felelősségű Társaság | 2 | 2024 |
| INFODIGIT Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság | 2 | 2025–2026 |
| ETIAM Korlátolt Felelősségű Társaság | 2 | 2024–2025 |
| "HOR" Kereskedelmi és Szolgáltató Zártkörű Részvénytársaság | 2 | 2023–2024 |
| OPUS TITÁSZ Áramhálózati Zártkörűen Működő Részvénytársaság | 2 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.