IMPROVEMENTS OF WORKS FROM ANAVALOU NETWORKS
ΒΕΛΤΙΩΣΕΙΣ ΕΡΓΩΝ ΑΠΟ ΔΙΚΤΥΑ ΑΝΑΒΑΛΟΥ
Greece · ΑΘΗΝΑ · how to bid here →
Your path to submission
- Deadline: 5 November at 11:00 — 33 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ELL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (323 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to ΕΛΛΗΝΙΚΗ ΤΕΧΝΙΚΗ ΚΑΤΑΣΚΕΥΑΣΤΙΚΗ ΕΡΓΟΛΗΠΤΙΚΗ ΚΤΗΜΑΤΙΚΗ ΕΜΠΟΡΙΚΗ ΚΑΙ ΕΡΓΩΝ ΥΠΟΔΟΜΗΣ ΕΤΑΙΡΕΙΑ ΠΕΡΙΟΡΙΣΜΕΝΗΣ ΕΥΘΥΝΗΣ δ.τ. ΕΛΤΕ ΕΠΕ.n = 323
- 63% of this buyer's awards went to companies that had already won here before (2,324 awards since 2014, spread over 865 companies). 37% went to new names.n = 2,324 awards since 2014
- The median procedure drew 2 bids (998 procedures with a bid count); 48% ended with a single bidder. Sector: median 1 bids.n = 998
- The award came in at a median 76% of the estimated value (10 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 10
- 9% of the bids received came from other countries (9 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 9
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 03/10/2026.
Foreign bidders
In Greece · Construction work, 126 contracts went to foreign companies over the last 3 years (of 53,280 recorded awards) — mostly from Italy, Germany, Albania.
Submission language: ELL.
Typical field: median 3 (from 160 awards).
What the buyer is looking for
IMPROVEMENTS OF TRANSPORT PROJECTS AND DISTRIBUTION OF IRRIGATION WATER FROM POSTPON NETWORKS TO KOUTSOPODI, MYKENES, MONASTIRAKI, FITIA N. ARGOLIDAS
Selection criteria — not structured in the notice
The buyer left the criteria block of the EU form empty; the eligibility requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Greek.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ΑΚΤΩΡ ΑΤΕ | 25 | 2024–2026 |
| MARNET ATE | 24 | 2023–2026 |
| Σύμπραξη Γραφείων Μελετών : ΕΤΜΕ : ΠΕΠΠΑΣ & ΣΥΝ/ΤΕΣ Ε.Ε, ΙΩΑΝΝΙΔΗΣ ΚΩΝΣΤΑΝΤΙΝΟΣ, ΔΑΦΝΗΣ ΠΑΥΛΟΣ, ΚΟΝΤΟΔΗΜΟΣ ΓΕΩΡΓΙΟΣ | 23 | 2021–2026 |
| ECOS ΜΕΛΕΤΗΤΙΚΗ ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ | 23 | 2019–2026 |
| MANESSIS TRAVEL | 21 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.