ESB Enabling Works Delivery at IDA Dundalk Science and Technology Park
Ireland · Dublin · how to bid here →
Your path to submission
- Deadline: 22 October at 15:00 — 17 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG, ENG, ENG, ENG.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (83 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to Radharc Landscaping Ltd.n = 83
- 30% of this buyer's awards went to companies that had already won here before (259 awards since 2013, spread over 137 companies). That is well below the sector norm (43%) — this buyer switches suppliers more often than others.n = 259 awards since 2013
- The median procedure drew 4 bids (227 procedures with a bid count); 10% ended with a single bidder. Sector: median 5 bids.n = 227
- 10% of awards went to companies from abroad (259 awards with a known winner country). Sector average: 2%.n = 259
- The award came in at a median 92% of the estimated value (31 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 31
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 05/10/2026.
Foreign bidders
In Ireland · Construction work, 128 contracts went to foreign companies over the last 3 years (of 9,880 recorded awards) — mostly from United Kingdom, Greece, Germany.
Submission language: ENG.
Typical field: median 4 (from 70 awards).
What the buyer is looking for
Installation of ducting and chambers to enable diversion of overhead ESB cables
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in English.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| MCB Civils Limited | 5 | 2023–2025 |
| O'Connor Sutton Cronin | 5 | 2020–2026 |
| Tracey Brothers Ltd | 4 | 2022–2026 |
| Total Highway Maintenance Ltd | 4 | 2019–2025 |
| Dancor Civil Engineering Ltd | 4 | 2020–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.