Pontoon Enhancement - Stonehams Lake, Roscommon
Ireland · Roscommon · how to bid here →
Your path to submission
- Deadline: 7 October at 16:00 — 4 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew 25 bids (105 procedures with a bid count); 4% ended with a single bidder. Sector: median 5 bids.n = 105
- In this sector the buyer awards roughly every 2 months (27 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Roadstone ltd..n = 27
- 22% of this buyer's awards went to companies that had already won here before (131 awards since 2023, spread over 101 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 131 awards since 2023
- The award came in at a median 95% of the estimated value (12 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 12
- 5% of awards went to companies from abroad (131 awards with a known winner country). Sector average: 2%.n = 131
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 29/09/2026.
Foreign bidders
In Ireland · Construction work, 128 contracts went to foreign companies over the last 3 years (of 9,857 recorded awards) — mostly from United Kingdom, Greece, Germany.
Submission language: ENG.
Typical field: median 8 (from 13 awards).
What the buyer is looking for
The commission comprises the design, manufacture and installation of upgrade works to an existing pontoon in Co. Roscommon. Includes role of PSDP and PSCS. All design shall be in accordance with the Yacht Harbour Association Ltd. Code of Practice for the Design and Construction of Marinas and Yacht Harbours in conjunction with the Marina Operations Manual. All materials and works to be fully certified.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in English.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Creevy lake Ltd Trading As Pembroke Alliance | 3 | 2026 |
| QMPC | 3 | 2026 |
| Jigsaw VAE Ltd t/a Jigsaw Better Business | 3 | 2026 |
| Business Process Improvement | 3 | 2026 |
| King and Moffatt Group | 3 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.