Säterigatan - new production of residential units
Säterigatan - nyproduktion av bostäder
Sweden · FALUN · how to bid here →
Your path to submission
- Deadline: 15 October at 21:59 — 12 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SWE.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew 3 bids (8 procedures with a bid count); 13% ended with a single bidder. Sector: median 7 bids.n = 8
- 27% of awards went to companies from abroad (11 awards with a known winner country). Sector average: 4%.n = 11
- 0% of this buyer's awards went to companies that had already won here before (11 awards since 2018, spread over 0 companies). 100% went to new names.n = 11 awards since 2018
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Sweden · Construction work, 4 contracts went to foreign companies over the last 3 years (of 637 recorded awards).
Submission language: SWE.
Typical field: median 8 (from 711 awards).
What the buyer is looking for
At Säterigatan in the Lundby district of Hisingen, the new zoning plan has gained legal force. The aim is to be able to build a densely connected building to better connect Norra Älvstranden with the rest of Lundby. Framtiden Byggutveckling AB has acquired Sannegården 90:3 (Quarter A-D) where all blocks comprise approximately 450 apartments. This procurement concerns block C with an option to also perform block D. There are also options for departing underground garages in each block.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Swedish.