Electrical Installation 1st Construction Phase Monument (Renovation/Expansion Dechant-Wessing School)
Elektroinstallation 1. BA Denkmal (Umbau/Erweiterung Dechant-Wessing-Schule)
Germany · Warendorf · how to bid here →
Your path to submission
- Deadline: 27 October at 10:00 — 19 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (20 awards, most recently October 2025) — by that rhythm the next award was due around January 2026. The last award went to Wettringer Bauunternehmen GmbH.n = 20
- The median procedure drew 7 bids (39 procedures with a bid count); 26% ended with a single bidder. Sector: median 4 bids.n = 39
- 47% of this buyer's awards went to companies that had already won here before (39 awards since 2023, spread over 21 companies). 53% went to new names.n = 39 awards since 2023
- 99% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 87%.n = 10
- Across 12 procedures with structured selection criteria, this buyer most often required: Minimum annual headcount (9 of 12), Professional register enrolment (9 of 12), Trade register enrolment (9 of 12), References: works (9 of 12).n = 12
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Construction work, 672 contracts went to foreign companies over the last 3 years (of 242,267 recorded awards) — mostly from Austria, Poland, France.
Submission language: DEU.
Typical field: median 4 (from 20 awards).
What the buyer is looking for
The city of Warendorf is planning to renovate the Dechant-Wessing-Schule in Warendorf- Hoetmar, Dechant-Wessing-Straße 28. The construction site is served by the Rövkamp road. The original school was built in 1900 and is listed, extensions were added around 1950 and 1960. The overall measure will be carried out in two construction phases and tendered separately. The listed school is the 1st section. At the end of October 2026, this was cleared and the students moved to a temporary (mobile space units). 1.BA must be completed by the end of October 2027. The user then moves from the building parts of the planned 2.BA to the monument. Then the works begin there, which are to be completed by the end of November 2028 as a separately advertised Baumassnahme. ---- See procurement documents for more details
What you must prove — eligibility criteria
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| D. P. Fliesen Pelster GmbH · Vreden | 3 | 2025 |
| Invest Gebäudeservice GmbH · Herne | 3 | 2025 |
| Boymann GmbH & Co. KG · Glandorf | 3 | 2025 |
| ESK GmbH Elektrotechnik | 3 | 2024–2025 |
| Gebäudeservice Dietrich West KG | 3 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.