FVE – Nymburk Winter Stadium and Labe Relaxation Centre
FVE – Zimní stadion Nymburk a Relaxační centrum Labe
Czechia · Nymburk · how to bid here →
Your path to submission
- Deadline: 9 October at 10:00 — 6 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES, CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 16 months (7 awards, most recently June 2026) — the next award is due around October 2027 by that rhythm. The last award went to Planergy s.r.o..n = 7
- 100% of the bids received came from small and medium-sized enterprises (11 procedures with a bid mix). Sector: 31%.n = 11
- 16% of this buyer's awards went to companies that had already won here before (33 awards since 2015, spread over 18 companies). That is well below the sector norm (49%) — this buyer switches suppliers more often than others.n = 33 awards since 2015
- The median procedure drew 4 bids (26 procedures with a bid count); 15% ended with a single bidder. Sector: median 3 bids.n = 26
- The award came in at a median 65% of the estimated value (7 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 73%.n = 7
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Czechia · Petroleum & fuels, 17 contracts went to foreign companies over the last 3 years (of 3,228 recorded awards).
Submission language: CES.
Typical field: median 13 (from 6 awards).
What the buyer is looking for
The subject of performance of both parts of this public contract is the supply and installation of a photovoltaic power plant (PVPP), including its connection to the existing electrical installation of buildings, connection to the contracting authority’s distribution system and the provision of service activities, including the guarantee of the supply of spare parts. The subject of performance of both parts of this public contract is the supply of new PPP equipment (apparatus). They must be equipment that has been newly acquired or manufactured and has not yet been used for its purpose. A detailed description of the subject-matter of performance is given in relation to the Pool part of the binding model of the contract for work forming Annex 8 to the tender specifications (‘the Pool contract’) and the Winter Stadium part of the binding model of the contract for work forming Annex 9 (‘the…
Show full description
… Winter Stadium contract’, the Pool contract and the Winter Stadium contract together hereinafter referred to as ‘the contracts’).
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| K-net Technical International Group, s.r.o. | 4 | 2024 |
| Pražská plynárenská, a.s. | 2 | 2024 |
| Powertica Energie a.s. | 2 | 2024 |
| P K I - Teplotechna Brno spol. s r.o. | 1 | 2025 |
| CENTROPOL ENERGY, a.s. | 1 | 2022 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.