1., - 23., Waste containers
1., - 23., Abfallbehälter
Austria · Wien · how to bid here →
Your path to submission
- Deadline: 2 November at 10:00 — 30 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 10 months (6 awards, most recently August 2026) — the next award is due around June 2027 by that rhythm. The last award went to Drahtgitter HOLLY Ges.m.b.H..n = 6
- 12% of awards went to companies from abroad (196 awards with a known winner country). Sector average: 42%.n = 196
- The median procedure drew 4 bids (114 procedures with a bid count); 13% ended with a single bidder. Sector: median 1 bids.n = 114
- 29% of this buyer's awards went to companies that had already won here before (196 awards since 2015, spread over 67 companies). 71% went to new names.n = 196 awards since 2015
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Austria · Transport equipment, 354 contracts went to foreign companies over the last 3 years (of 1,112 recorded awards) — mostly from Germany, Italy, Switzerland.
Submission language: DEU.
Typical field: median 2 (from 3 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Liefern von Abfallbehältern
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in German.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Praskac Pflanzenland GmbH | 9 | 2015–2026 |
| Erhard Sterlich Gesellschaft m.b.H. | 7 | 2015 |
| Grünwert Garten- und Landschaftsbau GmbH | 6 | 2015–2026 |
| SBG Spurny GmbH | 5 | 2015–2025 |
| Ing. Reischl GmbH | 5 | 2015–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.