IMT008/2025 - Tender for the Construction of a New Cargo Facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta.
Malta · Luqa · how to bid here →
Your path to submission
- Deadline: 15 October at 10:30 — 12 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (14 awards, most recently August 2026) — the next award is due around December 2026 by that rhythm. The last award went to RM CONSTRUCTION LTD.n = 14
- 4% of this buyer's awards went to companies that had already won here before (51 awards since 2019, spread over 18 companies). That is well below the sector norm (33%) — this buyer switches suppliers more often than others.n = 51 awards since 2019
- 16% of awards went to companies from abroad (51 awards with a known winner country). Sector average: 4%.n = 51
- The median procedure drew 4 bids (32 procedures with a bid count); 6% ended with a single bidder. Sector: median 4 bids.n = 32
- The award came in at a median 87% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 91%.n = 5
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Malta · Construction work, 10 contracts went to foreign companies over the last 3 years (of 367 recorded awards).
Submission language: ENG.
Typical field: median 2 (from 6 awards).
What the buyer is looking for
IMT008/2025 - Tender for the Construction of a New Cargo Facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in English.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| RM CONSTRUCTION LTD | 3 | 2024–2026 |
| CLINT AND DAVID GRECH LTD | 1 | 2024 |
| Matthew Bongailas | 1 | 2024 |
| Bonnici Bros Services Ltd | 1 | 2025 |
| Denfar Excavators Ltd | 1 | 2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.