Construction works for water supply and sewerage networks in Kužiai township, Šiauliai district municipality
Vandentiekio ir nuotekų tinklų Kužių mstl., Šiaulių r. sav., statybos darbai
Lithuania · Kuršėnai · how to bid here →
Your path to submission
- Deadline: 13 October at 10:00 — 9 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: LIT.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Foreign bidders
In Lithuania · Construction work, 9 contracts went to foreign companies over the last 3 years (of 1,740 recorded awards).
Submission language: LIT.
Typical field: median 3 (from 1,418 awards).
What the buyer is looking for
The supplier to whom the procurement contract will be awarded will be required, in accordance with the solutions of the submitted Technical Project, to draw up a work project and carry out the construction works designed in the Technical Project, to install a permanent information stand for the Project, to make all the necessary connections to the engineering networks, to obtain all the necessary permits, to draw up geodetic executable photographs, to carry out cadastral measurements of the installed engineering networks, to prepare cadastral measurement files and to carry out an inspection at the State Enterprise Centre of Registers in the Real Estate Register, in accordance with the authority of the contracting entity to register buildings at the State Enterprise Centre of Registers in the Real Estate Register, to prepare and transmit to the contracting entity the executory…
Show full description
… documentation of the completed works, to carry out all the necessary measurements, tests, cleaning works and all other works necessary for the signing of the construction completion document, and the construction(s) to be suitable for operation (hereinafter ‘Works’). The total length of the water supply networks (Ø32÷110 mm) in the works is approximately 7342 m; total length of domestic sewage disposal networks (Ø90÷200 mm): approx. 10773 m; Number of underground domestic wastewater pumping stations (productivity 4.0-15.0 l/s) - 7 units; total length of stormwater disposal and drainage networks (Ø110÷400 mm):, – approx. 4143 m