SUPPLY AND INSTALLATION OF SOLAR POWER PLANT ON THE ROOF OF DSO NOVO MESTO
DOBAVA IN MONTAŽA SONČNE ELEKTRARNE NA STREHI DSO NOVO MESTO
Slovenia · Novo mesto · how to bid here →
Your path to submission
- Deadline: 26 October at 10:00 — 23 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SLV.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (3 awards, most recently December 2025) — by that rhythm the next award was due around March 2026. The last award went to PETROL, Slovenska energetska družba, d.d., Ljubljana.n = 3
- 2% of this buyer's awards went to companies that had already won here before (61 awards since 2017, spread over 33 companies). That is well below the sector norm (35%) — this buyer switches suppliers more often than others.n = 61 awards since 2017
- The median procedure drew 7 bids (53 procedures with a bid count); 23% ended with a single bidder. Sector: median 3 bids.n = 53
- 13% of awards went to companies from abroad (61 awards with a known winner country). Sector average: 0%.n = 61
- 65% of the bids received came from small and medium-sized enterprises (34 procedures with a bid mix). Sector: 61%.n = 34
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Slovenia · Petroleum & fuels, 1 contracts went to foreign companies over the last 3 years (of 427 recorded awards).
Submission language: SLV.
Typical field: median 2 (from 3 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (SL).
Show original description (SL)
DOBAVA IN MONTAŽA SONČNE ELEKTRARNE NA STREHI DSO NOVO MESTO
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovenian.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SANOLABOR, podjetje za prodajo medicinskih, laboratorijskih in farmacevtskih proizvodov, d.d. | 2 | 2024–2026 |
| KIMI d.o.o., proizvodno trgovsko podjetje | 1 | 2026 |
| MESARSTVO OBLAK, proizvodnja, trgovina in storitve, d.o.o. | 1 | 2026 |
| EXTRA LUX, proizvodno in trgovsko podjetje d.o.o., Ljubljana | 1 | 2026 |
| INPOS, Tehnična trgovina na debelo in drobno, d.o.o., Celje | 1 | 2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.