Architect led Design Team for new MD Offices, Celbridge Co. Kildare
Ireland · Naas · how to bid here →
Your path to submission
- Deadline: 30 October at 16:00 — 26 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew 17 bids (134 procedures with a bid count); 2% ended with a single bidder. Sector: median 6 bids.n = 134
- In this sector the buyer awards roughly every 3 months (29 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to RDA Contracts.n = 29
- 25% of this buyer's awards went to companies that had already won here before (155 awards since 2023, spread over 115 companies). That is well below the sector norm (37%) — this buyer switches suppliers more often than others.n = 155 awards since 2023
- The award came in at a median 96% of the estimated value (21 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 97%.n = 21
- 3% of awards went to companies from abroad (155 awards with a known winner country). Sector average: 5%.n = 155
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Ireland · Architecture & engineering, 381 contracts went to foreign companies over the last 3 years (of 8,385 recorded awards) — mostly from United Kingdom, Spain, France.
Submission language: ENG.
Typical field: median 19 (from 23 awards).
What the buyer is looking for
Architect Lead Design Team Services for New Municipal District Offices on Council Owned Land at M4 Junction 6 (Celbridge West), Co. Kildare for Kildare County Council.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in English.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| RBK Construction Ltd | 5 | 2025–2026 |
| Treeline Ltd | 5 | 2023–2026 |
| Dunne Brothers Ltd | 4 | 2025–2026 |
| Bluestone Facilities Management Ltd | 4 | 2025–2026 |
| Hawthorn Heights Ltd | 4 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.