New daycare facility - Nørremarken in Ribe
Ny daginstitution - Nørremarken i Ribe
Denmark · Esbjerg · how to bid here →
Your path to submission
- Deadline: 26 October at 13:00 — 23 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DAN, DAN, DAN, DAN, DAN, DAN, DAN, DAN, DAN, DAN, DAN, DAN, DAN.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 23% of awards went to companies from abroad (116 awards with a known winner country). Sector average: 3%.n = 116
- 6% of this buyer's awards went to companies that had already won here before (116 awards since 2017, spread over 37 companies). 94% went to new names.n = 116 awards since 2017
- The median procedure drew 3 bids (93 procedures with a bid count); 25% ended with a single bidder. Sector: median 4 bids.n = 93
- The award came in at a median 94% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 92%.n = 8
- Across 4 procedures with structured selection criteria, this buyer most often required: References: services (2 of 4), Staff qualifications (1 of 4), Financial ratio required (1 of 4), Minimum annual turnover (1 of 4).n = 4
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Denmark · Construction work, 26 contracts went to foreign companies over the last 3 years (of 1,274 recorded awards) — mostly from Belgium, Germany, Bulgaria.
Submission language: DAN.
Typical field: median 4 (from 1,146 awards).
What the buyer is looking for
The case includes the construction of the institution in a plan, as a total unit of about 1673 m2, divided into a kindergarten for 60 kindergarten children aged 3-5 years, a crèche department for 80 children aged 0-3 years and an industrial kitchen, kindergarten and crèche staffed with a staff group of about 40 people. As an independent unit, a special kindergarten of approximately 391m2 for 8 children with physical or mental disabilities will be built in connection with the other buildings, this part will be manned by a staff group of 8 people. The institution is erected, light rear walls which are walled at the bottom and are carried out as zinc-clad façade at the top, internal partitions are carried out as stabilized concrete elements, aerated concrete walls and light plaster walls, respectively. The roofs are carried out as insulated roof cassettes with list cover, finished with zinc…
Show full description
… roof trenches and zinc sheaths. Alu entrances, wood/aluminum windows and terrace doors and floors are supplied and installed as terrain decks covered with either polyurethane, vinyl or floor tiles. Underfloor heating is carried out throughout the house plumbing, vent, electrical installations including solar cells and kitchen fixtures with appliances, reoline fixtures and wall panels are supplied. Outside areas are carried out with concrete tiles on paths, terraces and asphalt on driving and parking areas. Common areas are laid out in grass and as a playground. Sheds are established for pram shelters, sheds for playground equipment and for storage of bicycles.
Selection criteria — not structured in the notice
The buyer left the criteria block of the EU form empty; the eligibility requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Danish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Esbjerg Taxa Kørselskontor A/S | 3 | 2024 |
| INVACARE A/S | 2 | 2024–2025 |
| Trade-Line A/S | 2 | 2024 |
| Wolturnus A/S | 2 | 2024–2025 |
| ATKI A/S | 2 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.