North-East Area - Engineering and Execution Supervision Replacement Zuidergracht Drawbridge Harlingen
Gebied Noord-Oost - Engineering en uitvoeringsbegeleiding vervanging klapbrug Zuidergracht Harlingen
Netherlands · Utrecht · how to bid here →
Your path to submission
- Deadline: 27 October at 10:00 — 23 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (69 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to Arcadis Nederland B.V..n = 69
- The median procedure drew 3 bids (618 procedures with a bid count); 27% ended with a single bidder. Sector: median 5 bids.n = 618
- 18% of this buyer's awards went to companies that had already won here before (685 awards since 2015, spread over 161 companies). 82% went to new names.n = 685 awards since 2015
- The award came in at a median 82% of the estimated value (7 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 7
- 12% of awards went to companies from abroad (685 awards with a known winner country). Sector average: 8%.n = 685
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands · Architecture & engineering, 128 contracts went to foreign companies over the last 3 years (of 2,665 recorded awards) — mostly from Germany, France, United Kingdom.
Submission language: NLD.
Typical field: median 3 (from 67 awards).
What the buyer is looking for
The scope of the assignment concerns the engineering and execution supervision for the replacement of the bridge over the Zuidergracht in Harlingen. See tender file
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| VolkerRail Nederland B.V. | 20 | 2024–2026 |
| Dura Vermeer Railinfra B.V. | 14 | 2024–2026 |
| SWIETELSKY RAIL BENELUX B.V. | 12 | 2024–2025 |
| Arcadis Nederland B.V. | 11 | 2024–2026 |
| BAM Infra Rail B.V. | 11 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.