Technical Building Systems Engineering Planning
Fachplanung Technische Gebäudeausrüstung
Germany · Königs Wusterhausen · how to bid here →
Your path to submission
- Deadline: 6 October at 08:00 — 1 day left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 22% of this buyer's awards went to companies that had already won here before (46 awards since 2019, spread over 36 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 46 awards since 2019
- The median procedure drew just one bid (46 procedures with a bid count); 63% ended with a single bidder. Sector: median 3 bids.n = 46
- From notice to award takes a median 641 days here (18 procedures). Sector: 133 days.n = 18
- The award came in at a median 85% of the estimated value (7 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 88%.n = 7
- Across 4 procedures with structured selection criteria, this buyer most often required: Study and research facilities (4 of 4), References: services (4 of 4), Technical staff for execution (4 of 4), Minimum number of managers (4 of 4).n = 4
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Architecture & engineering, 401 contracts went to foreign companies over the last 3 years (of 110,078 recorded awards) — mostly from Austria, Switzerland, Poland.
Submission language: DEU.
Typical field: median 1 (from 7 awards).
What the buyer is looking for
Today's Central Emergency Department is at the capacity utilisation limit. The redesign of the processes requires refurbishment measures and extensions. The ITS is located spatially above the ZNA and is also being expanded. The measure is publicly funded and implementation must take place on an ongoing basis. The division into several construction phases to ensure operability may be required. Construction site logistics must be organised in compliance with the strictest boundary conditions. The subject of the procurement is the services of the technical planning technical equipment (TA) of the performance phase 4 - the HOAI. In addition, services from the service phase 3 - HOAI must be supplemented (see service description). Excluded are medical or laboratory equipment. The commissioning is subject to the expected release of the funding and granting of the building permit. The…
Show full description
… commissioning is carried out in stages analogous to the service phases of HOAI with the intention of commissioning all services. The right to further commissioning does not exist.
What you must prove — eligibility criteria
Tariftreue-Mindestanforderungen Nachunternehmer (Mit dem Angebot; Mittels Eigenerklärung): Vereinbarung zwischen dem Bieter/ Auftragnehmer/ Nachunternehmer/ Verleiher von Arbeitskräften und (ggf. weiteren) Nachunternehmer oder Verleiher zur Einhaltung der Mind… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Stadt- und Überlandwerke Gmbh Lübben · Lübben | 4 | 2024 |
| HPC AG · Harburg | 3 | 2026 |
| Solventum Germany GmbH | 3 | 2025 |
| B. Braun Deutschland GmbH & Co. KG | 3 | 2025–2026 |
| Assmann Beraten + Planen GmbH | 3 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.