Design and construction of RCGO Orlovnjak
Projektiranje i izgradnja RCGO Orlovnjak
Croatia · Osijek · how to bid here →
Your path to submission
- Deadline: 12 October at 10:00 — 9 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HRV.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew 2 bids (6 procedures with a bid count); 0% ended with a single bidder. Sector: median 3 bids.n = 6
- 71% of the bids received came from small and medium-sized enterprises (6 procedures with a bid mix). Sector: 81%.n = 6
- Across 5 procedures with structured selection criteria, this buyer most often required: References: works (5 of 5), Technical staff for execution (5 of 5), Minimum annual turnover (5 of 5), Trade register enrolment (5 of 5).n = 5
- 0% of the bids received came from other countries (6 procedures with a bid mix) — all bidders, not just the winners. Sector: 2%.n = 6
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Croatia · Construction work, 13 contracts went to foreign companies over the last 3 years (of 2,168 recorded awards).
Submission language: HRV.
Typical field: median 3 (from 2,175 awards).
What the buyer is looking for
The subject matter of the procurement is the services of design, execution of works and obtaining permits (construction permits, environmental permits, operating permits, temporary waste management permits, etc., as defined in Book 3 – REQUIREMENTS OF THE ORDERING PARTY) for the construction project of the Regional Waste Management Centre ‘Orlovnjak’, all in accordance with the terms of the contract for installations and design and construction for electrical and mechanical buildings and works according to the Contractor’s projects (FIDIC Žuta knjiga, first edition 1999, Croatian translation published by the Croatian Association of Consultants, the Croatian Chamber of Civil Engineers and the Association of Consulting Societies in Construction published in 2014). The subject of the works is also the commissioning of the plant, training of the Client's staff, proof of the required…
Show full description
… parameters in the probationary period and during the tests after completion, including the carrying out of a technical inspection and the elimination of hidden deficiencies in the period of 24 months of notification of deficiencies (DNP). The subject matter of the procurement is described in detail in Book 3 — Requirements of the Contracting Authority and Book 4 — Price chart, which are an integral part of the procurement documents. Book 5 – Substrates contains design substrates and drawings. The technical specifications (Book 3, Book 4 and Book 5) and other technical documentation are an integral part of this procurement document and are available to all tenderers via an online disk, at the following link: https://www.ekos-orlovnjak.hr/index.php/public-procurement/public-public-procurement/96-public-procurement/simple-procurement/325-rcgo-orlovnjak The procurement procedure in question is carried out as part of the project ‘Regional Waste Management Centre Orlovnjak’, which is co-financed by a grant from the European Union and the subject matter of the procurement is subject to control by intermediate bodies, national and EU audit bodies and/or persons authorised by it.
What you must prove — eligibility criteria
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| EKONERG d.o.o. | 2 | 2025 |
| DVOKUT - ECRO d.o.o. | 2 | 2025 |
| OSIJEK-KOTEKS d.d. | 1 | 2025 |
| SOKOL d.o.o. | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.