Ljevano željezni fazonski komadi i armature
Croatia · Čakovec · how to bid here →
Your path to submission
- Deadline: 20 October at 10:00 — 19 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HRV, ENG.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 35% of this buyer's awards went to companies that had already won here before (21 awards since 2024, spread over 14 companies). That is well below the sector norm (77%) — this buyer switches suppliers more often than others.n = 21 awards since 2024
- The award came in at a median 99% of the estimated value (11 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 72%.n = 11
- The median procedure drew 5 bids (21 procedures with a bid count); 10% ended with a single bidder. Sector: median 3 bids.n = 21
- Across 4 procedures with structured selection criteria, this buyer most often required: References: supplies (4 of 4), Product samples with authentication (4 of 4), Quality control by institutes (4 of 4), Trade register enrolment (4 of 4).n = 4
- Not one of the 21 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 21
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Croatia · Construction materials, 1 contracts went to foreign companies over the last 3 years (of 411 recorded awards).
Submission language: HRV.
Typical field: median 3 (from 405 awards).
What the buyer is looking for
A framework agreement is concluded with a single economic operator for a period of 2 years on public procurement of goods - SUPPLIED IRON FAZONSKI KOMADI AND ARMATURE. The tenderer must offer the full scope of the procurement required in the tender. Tenders covering only part of the required procurement volume will not be considered. The tenderer is obliged to offer the goods in accordance with all technical and other conditions specified in this Procurement Document. The cost defines the indicative quantities of the subject of procurement for a two-year period, since it is a utility cost that cannot be determined in advance the exact quantity. The Client does not undertake to realize the stated quantities in full. The actual realization depends on the needs, and can be higher or lower than the indicative quantity.
What you must prove — eligibility criteria
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Geokon-Zagreb d.d. | 2 | 2024 |
| HIDROTEHNIKA d.o.o. | 2 | 2026 |
| SZABADICS Építőipari Zártkörűen Működő Részvénytársaság (SZABADICS Zrt.) | 2 | 2024–2026 |
| NIGRAD d.o.o. | 2 | 2026 |
| Delmat Galiot d.o.o. | 2 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.