Valalika traction converter station
Trakčná meniareň Valaliky
Slovakia · Bratislava · how to bid here →
Your path to submission
- Deadline: 9 October at 09:00 — 6 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SLK, CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (23 awards, most recently April 2026) — by that rhythm the next award was due around July 2026. The last award went to TRANSSERVIS, a.s. Košice.n = 23
- 15% of this buyer's awards went to companies that had already won here before (202 awards since 2019, spread over 66 companies). That is well below the sector norm (39%) — this buyer switches suppliers more often than others.n = 202 awards since 2019
- The median procedure drew 2 bids (181 procedures with a bid count); 23% ended with a single bidder. Sector: median 5 bids.n = 181
- The award came in at a median 90% of the estimated value (24 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 24
- 90% of the bids received came from small and medium-sized enterprises (97 procedures with a bid mix). Sector: 79%.n = 97
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Slovakia · Construction work, 80 contracts went to foreign companies over the last 3 years (of 1,102 recorded awards) — mostly from Germany, Czechia, Italy.
Submission language: SLK.
Typical field: median 3 (from 23 awards).
What the buyer is looking for
The subject-matter of the contract is the preparation and delivery of the project documentation at the construction plan and construction project stage in the details of the implementation project (hereinafter referred to as SZP/VPP), the provision of engineering activities resulting in the provision of a final decision on the construction plan and the verification of the construction project by the competent authority (hereinafter referred to as SZP/VPP ID), the provision of the property-legal settlement of land owners (hereinafter referred to as SZP/VPP), the implementation of the construction, the provision of the related engineering activities during the construction implementation (hereinafter referred to as ‘construction ID’), the preparation and delivery of the design documentation for the actual construction of the construction (hereinafter referred to as DBZ) and the provision…
Show full description
… of the assessment of the ENE TSI by the notified body. The purpose of the construction is to improve the provision of reliable power supply to the traction line on the line section of Čaňa Št. hr. - Barca, which will have a positive impact on the continuity of rail traffic. Sufficient power will also be provided for the newly built electrified marshalling yard and siding of buildings of strategic importance Strategic area of Valalika. Further information on the subject of the contract can be found in Annexes 9a and 9b of the tender specifications - a description of the subject of the contract and an inventory of items.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak, Czech.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| TSS GRADE, a.s. | 6 | 2024–2025 |
| Alanata a. s. | 5 | 2024–2026 |
| DIPRO Consult, s.r.o. | 4 | 2024–2026 |
| InterWay, a. s. | 3 | 2023 |
| TEMPRA, s.r.o. | 3 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.