„Доставка на помпи за нуждите на ВиК ЕООД- гр. Стара Загора в три обособени позиции“
Bulgaria · гр. Стара Загора · how to bid here →
Your path to submission
- Deadline: 26 October at 23:59 — 23 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: BUL, BUL, BUL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (47 awards, most recently June 2026) — by that rhythm the next award was due around July 2026. The last award went to ХИДРОМОНТАЖ-Л ООД.n = 47
- 61% of this buyer's awards went to companies that had already won here before (1,263 awards since 2017, spread over 381 companies). 39% went to new names.n = 1,263 awards since 2017
- The award came in at a median 55% of the estimated value (98 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 71%.n = 98
- 1% of the bids received came from small and medium-sized enterprises (234 procedures with a bid mix). Sector: 29%.n = 234
- The median procedure drew 2 bids (997 procedures with a bid count); 47% ended with a single bidder. Sector: median 2 bids.n = 997
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Bulgaria · Industrial machinery, 1 contracts went to foreign companies over the last 3 years (of 1,462 recorded awards).
Submission language: BUL.
Typical field: median 1 (from 41 awards).
What the buyer is looking for
The subject-matter of this contract is divided into three lots depending on the intended use of the products and includes the supply of horizontal and vertical single-stage, multi-stage and submersible drinking water pumps as well as waste water pumps. Deliveries under each of the lots will be made according to periodic requests by the Contracting Authority depending on its financial capabilities and the specific needs that have arisen. The application will mention the specific parameters of the products (type and quantity). Each of the requests will be handed personally to an authorized representative of the Contractor, by post - by acknowledgment of receipt, by hand against signature or e-mail. Deliveries to be made by transport of the Contractor to the warehouse of the Assignor, located at: № 53 Voyvoda Stoyno Chernogorski Street, Stara Zagora, within 30 (thirty) working days of a…
Show full description
… request being served. The delivery and acceptance of the respective delivery will be certified by a handover and acceptance protocol signed by representatives of the Assignor and the Contractor. Partial performance of the contract and presentation of options for performance are not allowed. Items under all three lots must be new and unused, with a warranty period of at least 2 (two) years. The duration of the contract for each of the lots is 36 (thirty-six) months.
What you must prove — eligibility criteria
Участниците следва да са реализирали през последните 3 (три) приключили финансови години, в зависимост от датата, на която са създадени или са започнали дейността си, минимален общ оборот (чл.61, ал.1, т.1 предложение първо от ЗОП). Минимално изискване: Участн… ▸▾
Участникът следва да е изпълнил през последните 3 (три) години, считано от датата на подаване на офертата, минимум една дейност, с предмет идентичен или сходен с този на поръчката. (чл. 63, ал. 1, т. 1, буква „б“ от ЗОП). *Минимално изискване: Под „дейност с п… ▸▾
Участниците следва да са реализирали през последните 3 (три) приключили финансови години, в зависимост от датата, на която са създадени или са започнали дейността си, минимален общ оборот (чл.61, ал.1, т.1 предложение първо от ЗОП). Минимално изискване: Участн… ▸▾
Участникът следва да е изпълнил през последните 3 (три) години, считано от датата на подаване на офертата, минимум една дейност, с предмет идентичен или сходен с този на поръчката. (чл. 63, ал. 1, т. 1, буква „б“ от ЗОП). *Минимално изискване: Под „дейност с п… ▸▾
Участниците следва да са реализирали през последните 3 (три) приключили финансови години, в зависимост от датата, на която са създадени или са започнали дейността си, минимален общ оборот (чл.61, ал.1, т.1 предложение първо от ЗОП). Минимално изискване: Участн… ▸▾
Участникът следва да е изпълнил през последните 3 (три) години, считано от датата на подаване на офертата, минимум една дейност, с предмет идентичен или сходен с този на поръчката. (чл. 63, ал. 1, т. 1, буква „б“ от ЗОП). *Минимално изискване: Под „дейност с п… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ПЕТРОЛ АД | 37 | 2019–2026 |
| ИНФРАСТРУКТУРНИ СИСТЕМИ ЕООД | 35 | 2024–2026 |
| ОТП Лизинг ЕООД | 23 | 2022–2026 |
| ИНТЕРПРОКОНСУЛТ ООД | 20 | 2025–2026 |
| Изипей АД | 18 | 2018–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.