Achizitia serviciilor de proiectare faza SSF, CU+Avize, PUZ, DTAC+DTOE, Proiect Tehnic+DE si asistenta tehnica din partea proiectantului pentru obiectivul ”CAMPUS EDUCATIONAL CETATEA FETEI FLORESTI"
Romania · Floresti · how to bid here →
Your path to submission
- Deadline: 19 October at 15:00 — 17 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: RON.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (65 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to VTP SERVING.n = 65
- 65% of this buyer's awards went to companies that had already won here before (544 awards since 2022, spread over 186 companies). That is well above the sector norm (48%) — newcomers have a harder time here than elsewhere.n = 544 awards since 2022
- The median procedure drew 3 bids (12 procedures with a bid count); 25% ended with a single bidder. Sector: median 4 bids.n = 12
- 100% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 90%.n = 10
- Across 5 procedures with structured selection criteria, this buyer most often required: Share of subcontractors (5 of 5), Trade register enrolment (5 of 5), References: services (3 of 5), Average minimum annual turnover (2 of 5).n = 5
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/09/2026.
Foreign bidders
In Romania · Architecture & engineering, 81 contracts went to foreign companies over the last 3 years (of 89,804 recorded awards) — mostly from France, Netherlands, Italy.
Submission language: RON.
Typical field: median 4 (from 3,018 awards).
What the buyer is looking for
Procurement of design services phase SF, CU+Opinions, PUZ, DTAC+DTOE, Technical Project+DE and technical assistance from the designer for the objective "CAMPUS EDUCATIONAL CETATEA FETEI FLOREȘTI" according to the specifications. The services consist in the elaboration of the feasibility study, CU+Opinions, PUZ, DTAC+DTOE, Technical Project+DE and technical assistance from the building-specific designer. Developing a modern university campus in Floresti, integrated in the functional urban area of Cluj-Napoca, in order to increase the schooling capacity, decongest the educational infrastructure in the municipality and strengthen the role of Floresti as a residential and educational pole of the metropolitan area. Specific objective of the investment project: 1. Increasing the capacity of university infrastructure by creating modern educational spaces (course halls, laboratories, related…
Show full description
… facilities), adapted to demographic growth and academic demand in the metropolitan area. 2. Discongesting the educational infrastructure in Cluj-Napoca and strengthening Floreşti as an educational pole within the functional urban area. In accordance with Article 160(1) of Law 98/2016, as amended, the deadline by which any economic operator interested in participating in the public procurement procedure has the right to request clarifications or additional information in relation to the tender documentation is 22 days before the deadline for submission of tenders. The contracting authority establishes that the deadline within which it will respond to all requests for clarifications or additional information is on the 11th day before the deadline for the submission of tenders. The contracting authority mentions that it will respond to requests for clarifications sent by economic operators by the deadline set in the Contract Notice. Rules for communication and transmission of data: Requests for clarifications will be addressed exclusively in SEAP to the ‘Questions’ section of the electronic award procedure and the answers to them will be published in SEAP both in the ‘Documentation and Clarifications’ section and to each economic operator that has requested clarification, within the simplified contract notice. A.C. will respond in a clear and complete manner to all requests for clarifications no later than the 11th day before the date of submission of tenders. Number of days until which clarifications can be requested before the closing date for submission of tenders/candidates: 22 days
What you must prove — eligibility criteria
Este Inscris In registrele comerciale In statul membru de stabilire, astfel cum este descris In anexa XI la Directiva 2014/24/UE; operatorii economici din anumite state membre pot avea obligatia de a respecta alte cerinte stabilite In anexa respectiva. Certifi… ▸▾
Ofertantul va indica in oferta sa denumirea subcontractantului/subcontractantilor si datele de contact ale acestora, partea/partile din contract ce vor fi subcontractate, valoarea la care se ridica partea/partile respective, precum si acordul subcontractantilo… ▸▾
Ofertanții trebuie să demonstreze că au prestat în ultimii 3 ani (calculați de la data limită de depunere a ofertelor) servicii similare de proiectare la oricare fază SF/ CU+Avize, PUZ/ DTAC+DTOE/ Proiect Tehnic+DE pentru lucrări similare sau superioare de ace… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| LUKACOM INVEST SRL | 33 | 2024–2026 |
| SC DAVIDCAR SRL | 28 | 2024 |
| NSHOST S.R.L. | 26 | 2024–2026 |
| VARKATA S.R.L. | 17 | 2024 |
| CLAU COMPANY | 14 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.