Furnizare, montare, instalare, testare și punere în funcțiune a sistemului fotovoltaic aferent obiectivului „IMPLEMENTAREA UNEI NOI CAPACITĂȚI DE PRODUCȚIE DE ENERGIE ELECTRICĂ DIN SURSE REGENERABILE CEF 300KW-LOCALITATEA VALEA IAȘULUI, JUDEȚUL ARGEȘ’’
Romania · Valea Iasului · how to bid here →
Your path to submission
- Deadline: 23 October at 15:00 — 20 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: RON.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 39% of this buyer's awards went to companies that had already won here before (80 awards since 2024, spread over 49 companies). That is well below the sector norm (79%) — this buyer switches suppliers more often than others.n = 80 awards since 2024
- Not one of the 80 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 80
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
Among 27,566 recorded awards in Romania · Petroleum & fuels over 3 years, no foreign winner yet — bidding here means being a pioneer.
Submission language: RON.
Typical field: median 2 (from 1,823 awards).
What the buyer is looking for
The photovoltaic system will be composed of a total of 480 photovoltaic panels, each with a rated power of 625W(watt). The panels will be placed on a metallic corner anchored in the ground, oriented so as to maximize the capture of solar radiation throughout the day. The chosen configuration assimilates a high efficiency of converting solar energy into electricity and an increased durability over time, the panels being designed to withstand various climatic conditions. The total installed power at the photovoltaic field level (panel level) will be 300.0 kWp (kilowatt-peak), which reflects the maximum power generation capacity under standard test conditions (STC). For the conversion of energy produced in direct current by panels into alternating current usable in the network or for self-consumption, the system will be equipped with three (three) high-efficiency inverters with a power of…
Show full description
… 100 kW. Therefore, the total installed power in the inverter system will be 300.0kW, which ensures an adequate capacity to take and convert the energy generated by the photovoltaic field, with a technical reserve that allows peak operation and optimization of the overall performance of the plant. The system has been designed to allow easy integration into the local power grid and support the self-consumption needs of the community infrastructure. The selection of the technical components was made on the basis of an energy and economic feasibility analysis, taking into account the climatic specificity of the area, the solar radiation conditions, as well as the objective of maximum operational efficiency. This technical configuration will allow not only the constant production of green energy, but also an efficient control of the energy flow, through smart inverters, which monitor the essential parameters of the system and contribute to a safe, sustainable and economical functioning of the photovoltaic power plant. The discharge of the electricity produced by the photovoltaic plant will be carried out through a connection point to the electricity grid set at the voltage level 20kV, in the 20 kV line cell provided in PC 20kV CEF Valea Iasului. This technical solution was approved by ATR no.001500044662/29.04.2025. The works for the connection installation from the technical connection approval are carried out within another project. The requirements of PT will be complied with.
What you must prove — eligibility criteria
Operatorii economici care depun ofertă trebuie să dovedească o formă de înregistrare în condițiile legii din țara de rezidență, din care să rezulte că operatorul economic este legal constituit, că nu se află în niciuna dintre situațiile de anulare a constituir… ▸▾
Ofertantul (operator economic individual sau asociere de operatori economici) trebuie să demonstreze că, în ultimii 3 ani, calculați până la data-limită de depunere a ofertelor, a furnizat în mod corespunzător produse similare sau superioare din punct de veder… ▸▾
Se vor preciza partea/părțile din contract pe care operatorul economic intenționează să o/le subcontracteze şi datele de recunoaştere ale subcontractanţilor propuşi, dacă este cazul și doar pentru activități accesorii obiectului contractului. Resursele materia… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SC ALIFLOR INVEST 2008 SRL | 6 | 2024 |
| GEOTEHNICAL ROADS SRL | 4 | 2024 |
| HEPTAGRANT NSD | 4 | 2024 |
| ERMIL | 3 | 2024 |
| ONIX ECO ENERGY S.R.L. | 3 | 2024–2026 |