Establishment of a multi-party Integrated Design Team Framework
Ireland · Dublin · how to bid here →
Your path to submission
- Deadline: 19 October at 16:30 — 16 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (41 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to JEREMY GARDNER ASSOCIATES IRELAND LIMITED.n = 41
- 11% of this buyer's awards went to companies that had already won here before (191 awards since 2023, spread over 169 companies). That is well below the sector norm (37%) — this buyer switches suppliers more often than others.n = 191 awards since 2023
- The median procedure drew 5 bids (175 procedures with a bid count); 17% ended with a single bidder. Sector: median 6 bids.n = 175
- 16% of awards went to companies from abroad (191 awards with a known winner country). Sector average: 5%.n = 191
- The award came in at a median 94% of the estimated value (30 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 97%.n = 30
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/09/2026.
Foreign bidders
In Ireland · Architecture & engineering, 381 contracts went to foreign companies over the last 3 years (of 8,385 recorded awards) — mostly from United Kingdom, Spain, France.
Submission language: ENG.
Typical field: median 11 (from 40 awards).
What the buyer is looking for
Provision of a multi-party Integrated Design Team Framework Trinity College Dublin (“Trinity” / “TCD”) Capital Programmes Office has a need to establish an Integrated Design Team (“IDT”) Framework Panel (the “Framework” / “Panel”) to support the organisation’s capital works programme. The Framework adopts a multi-disciplinary model in which one Principal Service Provider (“PSP”) shall be nominated as Lead Consultant for each Call-Off, assuming responsibility for coordination and delivery of the Integrated Design Team. The Framework will provide a compliant, efficient, and high quality mechanism for appointing multi-disciplinary design teams across multiple projects over a defined period. It will ensure consistency of design quality, value for money, and adherence to procurement regulations. The Framework shall operate within the scope of the Capital Works Management Frameworks (“CWMF”) and National and EU procurement regulations.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in English.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Mason Technology Ltd | 3 | 2025 |
| Alpha Furniture Ireland | 2 | 2025 |
| Elementar UK | 2 | 2025–2026 |
| AECOM Ireland Limited_15958 | 2 | 2024 |
| DWE Scientific Limited_159885 | 2 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.