Friedrich & ClementBETA

Scragh Bog Wooden Boardwalk Removal and Replacement

Ireland · Wexford · how to bid here →

Your path to submission

  1. Deadline: 19 October at 12:00 — 16 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: ENG.
  4. Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (59 awards, most recently August 2026) — by that rhythm the next award was due around September 2026. The last award went to Madden and Mangan Construction Ltd.n = 59
  • The median procedure drew 2 bids (542 procedures with a bid count); 29% ended with a single bidder. Sector: median 5 bids.n = 542
  • 49% of this buyer's awards went to companies that had already won here before (621 awards since 2013, spread over 284 companies). 51% went to new names.n = 621 awards since 2013
  • The award came in at a median 95% of the estimated value (69 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 69
  • 8% of awards went to companies from abroad (621 awards with a known winner country). Sector average: 2%.n = 621

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.

Foreign bidders

In Ireland · Construction work, 128 contracts went to foreign companies over the last 3 years (of 9,857 recorded awards) — mostly from United Kingdom, Greece, Germany.

Submission language: ENG.

Typical field: median 4 (from 51 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Removal and rebuild by hand a wooden boardwalk of approximately 250 metres in length using FSC Douglas Fir. Removal includes embedded wooden support posts. Rebuild includes 2 No. boardwalk crossings, 3 No. passing points and 4 No. wooden benches

Description as published (EN).

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in English.

Eligibility analysis from the tender documents

Contract

BuyerDepartment of Housing Local Government and Heritage
TypeWorks
Estimated value250.000 €
Published21 September 2026
CategoryConstruction work · CPV 45246510

Who has won here before

CompanyAwardsPeriod
KRCEcological Ltd152021–2026
Wetland Surveys Ireland142021–2026
BEC Consultants Ltd122021–2026
Ecolab Ltd92024–2026
APEM Limited92024–2025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20216
20224
202317
202431
202533
202632

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 19 October at 12:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →
Scragh Bog Wooden Boardwalk Removal and Replacement — Friedrich & Clement