Friedrich & ClementBETA

Ramavtal Installation av apparatvagnar

Sweden · BORLÄNGE · how to bid here →

Your path to submission

  1. Deadline: 6 November at 23:59 — 34 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: SWE.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 8% of this buyer's awards went to companies that had already won here before (1,036 awards since 2021, spread over 182 companies). 92% went to new names.n = 1,036 awards since 2021
  • The median procedure drew 3 bids (1,003 procedures with a bid count); 21% ended with a single bidder.n = 1,003
  • The award came in at a median 97% of the estimated value (30 awards with both estimate and value) — pricing at the estimate is usually about right here.n = 30
  • Across 9 procedures with structured selection criteria, this buyer most often required: References: services (2 of 9), Minimum turnover in the contract field (2 of 9), Information security required (1 of 9), Study and research facilities (1 of 9).n = 9
  • 7% of awards went to companies from abroad (1,036 awards with a known winner country).n = 1,036

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Sweden, 427 contracts went to foreign companies over the last 3 years (of 5,659 recorded awards) — mostly from Finland, Germany, Denmark.

Submission language: SWE.

Typical field: median 18 (from 33 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The framework agreement concerns the installation of apparatus wagons. The trolleys are delivered empty and must be equipped with control and control equipment, switchgear and auxiliary transformers. The apparatus trolley is one of two units that make up a rotary converter. The rotary converters are part of the Swedish Transport Administration's power plant. The converters are fed with 3-phase voltage from the public power grid and output the voltage 16.5 kV and the frequency 16 2/3 Hz.

Machine translation (EU eTranslation) — official wording via the PDF link.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Swedish.

Contract

BuyerTrafikverket Myndighet
TypeServices
Estimated value95.000.000 SEK
Published21 September 2026
CategoryInstallation services · CPV 51100000

Who has won here before

CompanyAwardsPeriod
SWECO Sverige AB172026
Tyréns Sverige AB92026
Rejlers Sverige AB72026
WSP Sverige AB52026
Svevia AB (publ)52026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.
·
days until the deadline — Friday 6 November at 23:59

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →
Ramavtal Installation av apparatvagnar — Friedrich & Clement