AC012 - Grondwatermonitoring
Netherlands · Arnhem · how to bid here →
Your path to submission
- Deadline: 20 October at 10:00 — 17 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (17 awards, most recently November 2025) — by that rhythm the next award was due around February 2026. The last award went to Arcadis Nederland B.V..n = 17
- 2% of this buyer's awards went to companies that had already won here before (328 awards since 2015, spread over 135 companies). 98% went to new names.n = 328 awards since 2015
- The median procedure drew 4 bids (294 procedures with a bid count); 13% ended with a single bidder. Sector: median 5 bids.n = 294
- The award came in at a median 84% of the estimated value (19 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 19
- 4% of awards went to companies from abroad (328 awards with a known winner country). Sector average: 8%.n = 328
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Netherlands · Architecture & engineering, 128 contracts went to foreign companies over the last 3 years (of 2,665 recorded awards) — mostly from Germany, France, United Kingdom.
Submission language: NLD.
Typical field: median 2 (from 13 awards).
What the buyer is looking for
One of the aftercare activities at closed landfills is monitoring the quality of groundwater. Monitoring is required at 10 locations and is often an annual activity. As it is a recurring activity, a clustering of groundwater monitoring of 10 sites was chosen for a period of 6 years (2027, 2028, 2029, 2030, 2031 and 2032). The assignment also includes the periodic execution of some other aftercare activities, such as monitoring rainwater or surface water and the measurement/leveling of groundwater levels. Every year a report is drawn up for each location.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| KPN B.V. | 2 | 2025 |
| Van Doorn | 2 | 2024 |
| Arcadis Nederland B.V. | 2 | 2025 |
| Goudappel B.V. | 2 | 2024–2026 |
| DTV Consultants B.V. | 2 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.