Midigraver inclusief aanbouwdelen
Netherlands · ZWOLLE · how to bid here →
Your path to submission
- Deadline: 3 November at 10:00 — 30 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew 3 bids (114 procedures with a bid count); 14% ended with a single bidder. Sector: median 9 bids.n = 114
- 7% of this buyer's awards went to companies that had already won here before (127 awards since 2016, spread over 62 companies). 93% went to new names.n = 127 awards since 2016
- 10% of awards went to companies from abroad (127 awards with a known winner country). Sector average: 3%.n = 127
- The award came in at a median 38% of the estimated value (10 awards with both estimate and value) — pricing at the estimate is usually too high here.n = 10
- 47% of the bids received came from small and medium-sized enterprises (33 procedures with a bid mix).n = 33
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands, 2,047 contracts went to foreign companies over the last 3 years (of 35,143 recorded awards) — mostly from Germany, France, Belgium.
Submission language: NLD.
Typical field: median 9 (from 60 awards).
What the buyer is looking for
Delivery of one new midigraver including commissioning, instruction, warranty and long-term maintenance for the management and maintenance work of Waterschap Drents Overijsselse Delta. The reason for this Tender is the Contracting Authority's need for the supply of one (1) midigraver, including the attachments specified in the Schedule of Requirements, accessories and a preventive maintenance agreement for the entire duration of the warranty period.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Krinkels B.V. | 3 | 2024–2026 |
| Van der Weerd Grafhorst BV | 3 | 2025–2026 |
| Hobelman-Halle B.V. | 2 | 2024–2026 |
| MS Amlin Insurance SE | 2 | 2024–2025 |
| Foreco Houtproducten B.V. | 2 | 2025 |