Gebied Zee-Zevenaar - Watertransport spoortunnels en havenemplacementen
Netherlands · Utrecht · how to bid here →
Your path to submission
- Deadline: 26 October at 10:00 — 22 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 18% of this buyer's awards went to companies that had already won here before (685 awards since 2015, spread over 161 companies). 82% went to new names.n = 685 awards since 2015
- 12% of awards went to companies from abroad (685 awards with a known winner country). Sector average: 2%.n = 685
- The award came in at a median 82% of the estimated value (7 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 91%.n = 7
- The median procedure drew 3 bids (618 procedures with a bid count); 27% ended with a single bidder. Sector: median 3 bids.n = 618
- 28% of the bids received came from small and medium-sized enterprises (282 procedures with a bid mix). Sector: 36%.n = 282
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands · Cleaning, environment & waste, 38 contracts went to foreign companies over the last 3 years (of 2,163 recorded awards) — mostly from Germany, France, Belgium.
Submission language: NLD.
Typical field: median 3 (from 1,857 awards).
What the buyer is looking for
ProRail wishes to contract one party for: 1. Drain and transport PFAS-containing and purified water railway tunnels Zee-Zevenaar Proactive drainage, transport and discharge of the waste water (heaven, leak and test water) from the various railway tunnels on the Betuweroute. 2. Proactively pumping, transporting and discharging rainwater from five emplacements in the Zee – Zevenaar area. See guidance document
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| VolkerRail Nederland B.V. | 20 | 2024–2026 |
| Dura Vermeer Railinfra B.V. | 14 | 2024–2026 |
| SWIETELSKY RAIL BENELUX B.V. | 12 | 2024–2025 |
| Arcadis Nederland B.V. | 11 | 2024–2026 |
| BAM Infra Rail B.V. | 11 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.