Variantenstudie Spoorkruisingen voor Spoorzone Maastricht
Netherlands · Maastricht · how to bid here →
Your path to submission
- Deadline: 3 November at 09:00 — 30 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (27 awards, most recently July 2026) — by that rhythm the next award was due around August 2026. The last award went to Haskoning Nederland B.V..n = 27
- The median procedure drew 3 bids (297 procedures with a bid count); 24% ended with a single bidder. Sector: median 5 bids.n = 297
- 6% of this buyer's awards went to companies that had already won here before (364 awards since 2015, spread over 186 companies). 94% went to new names.n = 364 awards since 2015
- The award came in at a median 90% of the estimated value (29 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 29
- 7% of awards went to companies from abroad (364 awards with a known winner country). Sector average: 8%.n = 364
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands · Architecture & engineering, 128 contracts went to foreign companies over the last 3 years (of 2,665 recorded awards) — mostly from Germany, France, United Kingdom.
Submission language: NLD.
Typical field: median 5 (from 24 awards).
What the buyer is looking for
The municipality of Maastricht is looking for a party or combination of parties that will carry out a careful, integral and objectively substantiated variant study of new railway crossings for pedestrians and cyclists. A maximum available contract value of € 250,000,- excluding VAT has been set for this assignment. This maximum amount shall serve as the framework amount for the contract. Therefore, no rights can be derived from this framework.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Vebego Groen Participatie B.V. | 5 | 2024–2025 |
| Het NIC | 3 | 2024–2026 |
| Koninklijke Woudenberg | 2 | 2025–2026 |
| Xonar | 2 | 2025 |
| Geonius Groep B.V. | 2 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.