Friedrich & ClementBETA

Traffic measures

Verkeersmaatregelen

Netherlands · Zoetermeer · how to bid here →

Your path to submission

  1. Deadline: 12 October at 12:00 — 8 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: NLD.
  4. Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 4% of this buyer's awards went to companies that had already won here before (269 awards since 2015, spread over 125 companies). 96% went to new names.n = 269 awards since 2015
  • The median procedure drew 3 bids (223 procedures with a bid count); 23% ended with a single bidder. Sector: median 3 bids.n = 223
  • 14% of awards went to companies from abroad (269 awards with a known winner country). Sector average: 8%.n = 269
  • 47% of the bids received came from small and medium-sized enterprises (121 procedures with a bid mix). Sector: 38%.n = 121

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Netherlands, 2,047 contracts went to foreign companies over the last 3 years (of 35,143 recorded awards) — mostly from Germany, France, Belgium.

Submission language: NLD.

Typical field: median 3 (from 123 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The intention is that this framework contractor for the traffic measures in the broadest sense of the word (unless otherwise agreed) for, inter alia: • Establishing all traffic measures for work in and around infrastructure with the exception of the work area (work area closure remains part of the scope of the contractor carrying out the work); • Providing standard traffic measures according to the CROW 96B. • Providing traffic measures for events; • Supplying traffic controllers. All this in accordance with the Programme of Requirements set out in Annex 4 and the Specifications Framework Agreement 2026-090078 in Annex 5. The municipality has no purchase obligation and does not provide a turnover guarantee. However, the Municipality does limit the total size/value of this Assignment (initial term including renewal options) to € 5,000,000.

Machine translation (EU eTranslation) — official wording via the PDF link.

Selection criteria — via the ESPD

The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.

Eligibility analysis from the tender documents

Contract

BuyerGemeente Zoetermeer
TypeServices
Estimated valuevalue not published
Published21 September 2026
CategoryTransport support services · CPV 63712700

Who has won here before

CompanyAwardsPeriod
Flextender B.V.92024–2026
SULO Nederland BV22025
HaskoningDHV Nederland B.V.22024–2025
De Zorgprofs ZVW B.V.22024–2025
Careclean B.V.12024
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20242
20263

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 12 October at 12:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →